The VA is conducting market research for the renovation of the Sterile Processing Service (SPS) Phase 3 at the Central Virginia VA Healthcare System in Richmond, VA. The project involves a design‑build construction effort to create a new vestibule, demolition of existing finishes, installation of SPS‑compliant flooring and wall finishes, and integration of specialized medical equipment (Getinge washer‑disinfectors, STERIS sterilizer loading car, AMSCO sinks, etc.). The contractor must adhere to VA construction standards, OSHA 29 CFR 1926, and provide infection‑control measures during construction. The anticipated contract magnitude is $2 million‑$5 million, with a performance period of one year once awarded.
• Full‑scope design‑build renovation of SPS facility (partitions, sliding doors, flooring, walls, equipment installation).
• Required capabilities: commercial/institutional building construction, medical equipment installation, compliance with VA infection‑control and safety standards.
• Estimated project size $2‑5 M; performance period 365 days; submission deadline Nov 4 2026, 4 PM EST.
• Primary point of contact: Contracting Officer Denise A. Morman (email & phone provided).
You found this one. Bid Banana has 1.6M+ bids and awards.
You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.