UCLA Health is soliciting sealed‑lump‑sum bids from pre‑qualified demolition, concrete, framing and drywall subcontractors to reconfigure the 4th‑floor patient care areas of the Ronald Reagan UCLA Medical Center. The work includes selective demolition, cast‑in‑place concrete, metal‑stud framing, insulation, fire‑resistant joint systems, access doors, non‑structural metal framing, GFRG, and Level 4 gypsum board finish across roughly 67,400 gsf, plus exterior deck protection. The contract value for this package is estimated at $9.775 M and will be awarded to the lowest responsive bidder who meets licensing, wage‑rate and pre‑qualification requirements.
• Scope covers demolition, concrete, metal‑stud framing, insulation, fire‑joint systems, drywall (Level 4) and related accessories on the 4th floor, limited areas on floors 3 & 5, outdoor decks, and Charles Young Drive.
• Mandatory pre‑bid Zoom conference (6 Nov 2026 10 a.m.) and on‑site job walk (6 Nov 2026 1 p.m.) must be attended; bids due 3 Dec 2026 2 p.m.
• Requires active California B‑License, UC Fair Wage compliance, and registration with California DIR; encourages SBE/DVBE participation.