Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Construction
  5. ›RRUMC 4th Floor Patient Care Reconfiguration (BP 14…

UCLA Capital Programs·California

RRUMC 4th Floor Patient Care Reconfiguration (BP 14 - Resilient Flooring)

Rolling / TBD close$150k – $250kInvitation for Bid
Get bids like this by emailBid source

Description

The University of California Los Angeles is seeking a pre‑qualified subcontractor to install resilient flooring on the 4th‑floor patient‑care renovation at Ronald Reagan UCLA Medical Center. The scope covers approximately 67,400 gross square feet of new and upgraded flooring across multiple wings, requiring compliance with ADA, safety, sustainability, and UC Fair Wage regulations. Bids are sealed, limited to pre‑qualified firms, and must be submitted to the CM/contractor, DPR Construction, by the stated deadline.

Attached files

Key dates

Opened
10/23/2026
Closes
Rolling / TBD

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
907518.01

Budget estimate

$150,000 – $250,000

The package’s estimated construction cost is $2.1 million. Assuming typical subcontractor profit margins of 5‑12 % after direct costs (materials, labor, insurance, overhead) for a specialty flooring job, the net earnings would likely fall between $105,000 and $252,000. Market conditions, the need for specialized medical‑grade flooring, and compliance with UC Fair Wage requirements could push the upper end of the range higher. Therefore a reasonable estimate is roughly $150k‑$250k.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

UCLA Capital Programs·California

Top match · 92%

RRUMC 4th Floor Patient Care Reconfiguration (BP 20 - Interior Signage)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

92% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 12 - Tile & Associated Waterproofing)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

92% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 18a - Specialties)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

92% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 5 - Casework / Millwork)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

92% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 5 - Window Treatment/ Overhead Curtain)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

92% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 18b - Wall Protection)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

91% match

RRUMC 4TH Floor Patient Care Reconfiguration (BP 11 - Demolition, Concrete, Framing and Drywall)

Closes 12/3/2026Opened 10/26/2026

UCLA Capital Programs·California

91% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 10 - Glass & Glazing)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

91% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 24 - HVAC)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

90% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 21 - Install Owner Furnished Equipment)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

90% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 17a - Resinous Coating)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

90% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 25 - Electrical)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

89% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 13 - Acoustical Ceiling)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

89% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 23 - Plumbing)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

88% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 22 - D/B Fire Protection)

Rolling / TBD closeOpened 10/15/2026

UCLA Capital Programs·California

87% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 9 - Doors/ Frames/ Hardware)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

81% match

SMUMC Room 3411 Interventional Radiology Equipment Replacement

Closes 11/10/2026Opened 10/7/2026

California Department of Veterans Affairs·California

79% match

25HS0024 - NCVC Flooring Replacement Service

Closes 11/16/2026Opened 10/2/2026

U.S. Department Of Veterans Affairs·Iowa

78% match

Replace Operating Room 5 Flooring

Closes 11/3/2026Opened 10/14/2026

UCLA Capital Programs·California

78% match

UWVMC 2nd Floor Sterilizer Replacement

Closes 11/17/2026Opened 10/13/2026

U.S. Department Of Veterans Affairs·California

78% match

FY27 NRM Replace Flooring in McClellan VA Northern California Health Care System McClellan CA Project 612A4 27 020

Closes 11/17/2026Opened 10/19/2026