Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Construction
  5. ›RRUMC 4th Floor Patient Care Reconfiguration (BP 23…

UCLA Capital Programs·California

RRUMC 4th Floor Patient Care Reconfiguration (BP 23 - Plumbing)

Rolling / TBD close$568k – $1.1MInvitation for Bid
Get bids like this by emailBid source

Description

The University of California, Los Angeles (UCLA) Health is soliciting sealed, lump‑sum subcontract bids from pre‑qualified plumbing firms to perform the full plumbing scope of the Ronald Reagan UCLA Medical Center (RRUMC) 4th‑Floor Patient Care Reconfiguration. This package, valued at approximately $11.35 million, covers all plumbing work needed to convert existing behavioral‑health spaces into medical/surgical patient care areas, including water supply, drainage, medical gas, fire protection, and stormwater systems across roughly 67,400 gsf of renovated floor space. • Scope includes complete installation, alteration, and upgrade of all plumbing‑related building systems for a large hospital renovation (≈ 103 beds, 67,400 gsf). • Only firms already pre‑qualified by UCLA may submit; bids must be delivered to DPR Construction at 4665 MacArthur Court, Suite #100, Newport Beach, CA 92660. • Bid documents became available October 23 2026; final submission deadline is 12:00 PM PT on November 30 2026. • Contractors must hold an active California plumbing contractor’s license, comply with UC Fair Wage requirements, and be registered with the California DIR under public‑works labor codes.

Attached files

Key dates

Opened
10/23/2026
Closes
Rolling / TBD

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238220
Solicitation №
907518.01

Budget estimate

$567,500 – $1,135,000

The plumbing package is budgeted at $11.35 M. Subcontractors typically earn a profit margin of 5‑10% on such large‑scale projects after covering labor, material, and overhead costs. This suggests a net earnings range roughly between $567,500 and $1,135,000, depending on the firm’s efficiency, the exact scope of work, and any change‑order adjustments.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

UCLA Capital Programs·California

Top match · 93%

RRUMC 4th Floor Patient Care Reconfiguration (BP 18a - Specialties)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

93% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 12 - Tile & Associated Waterproofing)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

92% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 21 - Install Owner Furnished Equipment)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

92% match

RRUMC 4TH Floor Patient Care Reconfiguration (BP 11 - Demolition, Concrete, Framing and Drywall)

Closes 12/3/2026Opened 10/26/2026

UCLA Capital Programs·California

92% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 5 - Casework / Millwork)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

91% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 20 - Interior Signage)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

91% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 5 - Window Treatment/ Overhead Curtain)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

90% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 25 - Electrical)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

90% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 22 - D/B Fire Protection)

Rolling / TBD closeOpened 10/15/2026

UCLA Capital Programs·California

90% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 13 - Acoustical Ceiling)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

90% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 24 - HVAC)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

89% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 10 - Glass & Glazing)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

89% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 14 - Resilient Flooring)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

89% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 17a - Resinous Coating)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

89% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 9 - Doors/ Frames/ Hardware)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

88% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 18b - Wall Protection)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

84% match

SMUMC Room 3411 Interventional Radiology Equipment Replacement

Closes 11/10/2026Opened 10/7/2026

UCLA Capital Programs·California

80% match

UWVMC 2nd Floor Sterilizer Replacement

Closes 11/17/2026Opened 10/13/2026

NYS OGS Design & Construction - Construction Contractors·New York

80% match

45298 PLUMBING – Alterations and Improvements, Building No. 75

Closes 12/2/2026Opened 10/20/2026

City of Long Beach·California

79% match

As-Needed Plumbing Services

Closes 12/1/2026Opened 10/20/2026