Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Idaho guideIdaho Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Idaho
  4. ›Construction
  5. ›LC270002 – P1FCU Activity Center – Basement Flooring…

Lewis-Clark State College·Idaho

LC270002 – P1FCU Activity Center – Basement Flooring Replacement

Closes 11/5/2026$150k – $300kInvitation for Bid
Get bids like this by emailBid source

Description

The Idaho State‑funded Lewis‑Clark State College is seeking a low‑price contractor to remove existing carpet and vinyl flooring, grind a textured epoxy surface, and install new luxury‑vinyl‑plank (Armstrong) and carpet‑tile (TAS) flooring, along with rubber wall base, transition strips, and a logo graphic across multiple locker rooms and trainer areas in the P1FCU Activity Center basement. The work includes a 10 % material overage, a one‑year workmanship warranty, and full close‑out documentation, to be completed within 120 calendar days after notice to proceed. • Demolition of existing flooring and wall base, grind epoxy in Trainer’s Suite. • Installation of specified LVP, carpet‑tile, rubber wall base, transition strips, and LC logo. • Provide 10 % material over‑age, warranties, and all required close‑out paperwork.

Attached files

Contact

Redgy Erb(Contact Person)

[email protected]

(208) 792-2247

Key dates

Opened
10/10/2026
Pre-bid meeting
10/29/2026
Closes
11/5/2026
Duration
120 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238330
Solicitation №
LC270002

Budget estimate

$150,000 – $300,000

The project involves demolition of existing finishes across several locker rooms and a trainer suite, plus supply and installation of high‑end Armstrong LVP, TAS carpet‑tile, rubber base, and associated accessories. Assuming an average installed cost of $8–$12 per square foot for LVP plus demolition and labor, and estimating roughly 15,000 sq ft of total floor area, the total contract value is likely in the $120,000–$300,000 range. Additional costs for material over‑age, logo installation, and warranties push the high end upward. Therefore a reasonable budget estimate is $150k–$300k.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Lewis County Schools·West Virginia

Top match · 83%

Lewis County Schools Flooring Bid Package (On-Call Flooring Repair, Replacement, Removal & Installation)

Closes 11/4/2026Opened 10/21/2026

Horry Georgetown Technical College·South Carolina

82% match

Asbestos Removal, Floor Repair and Carpet Replacement Conway Campus

Closes 10/27/2026Opened 10/2/2026

Massachusetts City of Lawrence·Massachusetts

81% match

Cementitious-Urethane (Epoxy) Flooring

Closes 11/5/2026Opened 10/21/2026

University of Southern Mississippi·Mississippi

81% match

Joseph Anderson Cook Memorial Library Third‑Floor Carpeting

Closes 11/17/2026Opened 10/14/2026

Northcentral Technical College·Wisconsin

80% match

F & G Building Flooring Replacement - NTC Wausau Campus

Closes 10/29/2026Opened 10/14/2026

Winooski School District·Vermont

80% match

Gym Flooring and Upgrades

Closes 11/30/2026Opened 10/22/2026

Northern Virginia Community College·Virginia

80% match

260-B5260-015 NVCC LC Relocate Fitness Center

Closes 10/26/2026Opened 9/24/2026

City of Lawrence·Massachusetts

80% match

Cementitious-Urethane (Epoxy) Flooring Installation

Closes 11/5/2026Opened 10/20/2026

California Department of Veterans Affairs·California

79% match

25HS0024 - NCVC Flooring Replacement Service

Closes 11/16/2026Opened 10/2/2026

Sulphur Springs Union School District·California

79% match

Project No. DW 2026-09-22 Unit Bid Flooring District Wide

Closes 10/27/2026Opened 9/22/2026

New York City Department of Education·New York

79% match

Bid Extension: REQUIREMENTS CONTRACT FOR THE REPAIR AND REPLACEMENT OF WOOD FLOORS

Rolling / TBD closeOpened 5/25/2023

South Carolina Juvenile Justice·South Carolina

79% match

SCDJJ CAMP WHITE PINES - FLOORING

Closes 10/26/2026Opened 8/10/2026

Springfield Public Schools·Missouri

79% match

Multisite Selective Flooring Replacement

Closes 10/30/2026Opened 10/14/2026

Dillwyn Correctional Center·Virginia

79% match

Resinous Industrial Floor Coating Furnish and Install

Closes 11/23/2026Opened 10/21/2026

Lorain County·Ohio

78% match

Lorain/Medina CBCF Epoxy Floor Replacement

Closes 11/5/2026Opened 10/7/2026

Darlington County·South Carolina

78% match

Laminate Flooring

Closes 11/26/2026Opened 10/13/2026

U.S. Department Of Veterans Affairs·California

78% match

FY27 NRM Replace Flooring in McClellan VA Northern California Health Care System McClellan CA Project 612A4 27 020

Closes 11/17/2026Opened 10/19/2026

Department of Juvenile Justice·South Carolina

78% match

Camp White Pines - Flooring

Closes 10/26/2026Opened 10/21/2026

Glendale Community College District·California

78% match

Glendale Community College – Campus-Wide Restroom Upgrades

Closes 10/29/2026Opened 10/21/2026

U.S. Department Of Homeland Security·Alaska

78% match

UNITED STATES COAST GUARD KETCHIKAN ALASKA NEW CARPET INSTALLATION

Closes 10/30/2026Opened 9/25/2026

City of Lincoln·Nebraska

78% match

Carpet Enhancements for Pinnacle Bank Arena

Closes 11/4/2026Opened 10/21/2026