Muscatine Power and Water is soliciting sealed bids for the design, supply, installation, testing, and integration of a Continuous Emissions Monitoring System (CEMS) at its plant in Muscatine, Iowa. The contractor must provide a complete, functional system—including enclosure, sample probes, umbilical lines, conditioning equipment, analyzers, instrument panel, calibration gas, controller, and data acquisition hardware—and ensure factory testing and integration with existing DAHS and emissions reporting platforms. The project is eligible for the Inflation Reduction Act Investment Tax Credit, and all structural steel must meet domestic content requirements. Bids are due electronically via Ion Wave by 2:00 PM CT on 27 Oct 2026; a virtual pre‑bid meeting is scheduled for 6 Oct 2026.
• Supply and install one CEMS enclosure and all associated hardware.
• Provide sample probes, umbilical lines, and conditioning system for two exhaust stacks.
• Deliver and commission monitoring analyzers, instrument panel, calibration gas system, controller, and DAHS interface.
• Perform factory testing and on‑site integration with existing plant DAHS.
• Comply with IRA domestic‑content rules and structural steel requirements.
• Submit required bid security, schedules, references, and compliance narratives.