Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Minnesota guideMinnesota Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More architecture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Minnesota
  4. ›Closed bids
  5. ›St. Paul Water Utility Booster Station & Backup System Improvements

University of Minnesota·Minnesota

St. Paul Water Utility Booster Station & Backup System Improvements

Closes 9/21/2026$500k – $1.5MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The University of Minnesota is seeking a qualified architectural firm to provide full‑service design (schematic, design development, construction documents, and construction administration) for improvements to the St. Paul water‑utility booster station and its backup system. The scope includes basic design phases, supplemental services such as site‑survey procurement, and excludes programming, BIM, value analysis, and furniture design. The contract will be a fixed‑price lump‑sum, with the 100 % construction‑document set required by 31 Dec 2026. The selection process includes a non‑mandatory pre‑proposal meeting on 10 Sep 2026 and a hard deadline for proposals on 21 Sep 2026. • Primary deliverables: schematic, design‑development, construction‑document, and construction‑administration phases. • Required supplemental service: procurement and management of site survey. • Excluded services: programming/predesign, BIM, detailed cost estimating beyond contract requirements, furniture, fixtures & equipment. • Evaluation criteria weighted across team qualifications (30 %), work plan (30 %), fee (30 %), schedule (10 %). • Fixed‑price contract under AIA B101‑2017 with lump‑sum fee covering all costs, overhead and profit. • Critical dates: RFP issued 27 Aug 2026, pre‑proposal meeting 10 Sep 2026, questions due 15 Sep 2026, proposal due 21 Sep 2026, award notification 1 Oct 2026, authorization to proceed 6 Oct 2026, CD phase complete by 31 Dec 2026.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kevin Sullivan(Bid Contact)

[email protected]

Key dates

Opened
8/27/2026
Questions due
9/15/2026
Pre-bid meeting
9/10/2026
Closes
9/21/2026
Projected award
10/1/2026
Duration
4 months

Last updated

Details

Type
Request for Proposal
Industry
Architecture
NAICS
541310
Solicitation №
02-307-27-4227 Addendum 2

Budget estimate

$500,000 – $1,500,000

Based on comparable university‑level utility design projects, a fixed‑price architectural design contract for a water‑utility booster station typically ranges from $0.5 million to $1.5 million. The lower bound reflects a modest scope limited to design documents; the upper bound accounts for extensive site‑survey coordination, multiple design iterations, and higher professional rates in the Minneapolis‑St. Paul market. Factors influencing the final fee include the complexity of the booster station, required coordination with civil engineers, and the inclusion of supplemental services such as site‑survey procurement.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Metropolitan Council·Minnesota

Top match · 72%

St. Paul OMF Water Vacuum System Upgrades

Closes 11/3/2026Opened 10/7/2026

City of Alexandria·Louisiana

70% match

City of Alexandria - Water System Improvements - Hwy 1 South Booster Station, Ground Storage Tank & Water Main

Closes 11/3/2026Opened 10/2/2026

Jackson County Utility Authority·Mississippi

69% match

Pump Station #20 Rehab

Closes 10/20/2026Opened 9/20/2026

Pinellas County·Florida

69% match

Gulf Beach Water Booster Station Improvements (PID 002150A)

Closes 10/20/2026Opened 10/2/2026

City of Charlotte·North Carolina

68% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

City of Dublin, OH - Engineering·Ohio

68% match

Water Booster Station Improvements

Closes 10/28/2026Opened 9/30/2026

Hastings Utilities·Nebraska

68% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

Mississippi

67% match

Pump Station 20 Rehabilitation and Capacity Improvements

Closes 10/20/2026Opened 10/5/2026

U.S. Department Of Defense·Michigan

67% match

9-Mile Pump Station

Closes 10/20/2026Opened 10/7/2026

City of Lewiston·Maine

67% match

2026-039 2026 Pump Station Replacements - Foss 2 and Sabattus

Closes 10/27/2026Opened 8/12/2026

City of Dublin·Ohio

67% match

Water Booster Station Improvements

Closes 10/28/2026Opened 9/30/2026

Rivanna Water & Sewer Authority·Virginia

67% match

IFB # 448 - Airport Road Pump Station & Ground Storage Tank Improvements

Closes 10/22/2026Opened 9/24/2026

City of Waynesboro·Virginia

66% match

Shenandoah Village Drive Pump Station Replacement and System Improvements Contract I

Closes 11/10/2026Opened 9/30/2026

League City·Texas

66% match

Landing Blvd Lift Station Rehab WW1901F

Closes 11/3/2026Opened 10/2/2026

City of Dublin·Ohio

66% match

Water Booster Station Improvements

Closes 10/28/2026Opened 9/30/2026

City of Tampa, Florida·Florida

66% match

26-C-00038 Pump Station Resiliency and Reliability Improvements Contract A

Closes 10/13/2026Opened 9/23/2026

Consolidated Waterworks District No. 1 of Pointe Coupee Parish·Louisiana

66% match

Consolidated Waterworks District No. 1 of Pointe Coupee Parish - Contract No. 3 Water Distribution System Improvements (Lemoine's Trailer Park) Water Sector Program, Phase 2 (Re-Advertisement)

Closes 10/27/2026Opened 9/24/2026

City of Opa-locka·Florida

66% match

Pump Station 11-C Bypass Control

Closes 10/30/2026Opened 9/25/2026

City of Aurora, OH·Ohio

66% match

Aurora Park Utility Improvements - ReBid

Closes 11/5/2026Opened 10/9/2026

Connecticut Town of Stonington·Connecticut

66% match

ITB No 2026-005ston WPCA River Road Pump Station Upgrades

Closes 10/22/2026Opened 9/10/2026

City of Fredonia·Kansas

66% match

Distribution System Improvements - Fredonia, KS

Closes 11/12/2026Opened 10/29/2026

Kansas Department of Wildlife and Parks·Kansas

66% match

Pratt Water System Improvements

Closes 11/10/2026Opened 10/12/2026

New Holland Rural Community Water District·South Carolina

66% match

BACKUP GENERATOR FOR WELL

Closes 10/13/2026Opened 9/10/2026

City of South San Francisco·California

65% match

Oyster Point Sanitary Sewer Pump Station Relocation

Closes 11/5/2026Opened 10/1/2026

City of Newark·New Jersey

65% match

Newark Wayne Booster Pump Station Upgrade

Closes 10/28/2026Opened 6/18/2026