Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Missouri guideMissouri Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Missouri
  4. ›Construction
  5. ›Replacement of Bridge 9 on MKT Trail

City of Columbia·Missouri

Replacement of Bridge 9 on MKT Trail

Closes 11/10/2026$500k – $1.5MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Columbia, Missouri is seeking qualified contractors to design, fabricate, deliver, and install a new 105‑foot single‑span prefabricated truss pedestrian bridge (Bridge 9) on the MKT Trail over Flat Branch Creek. The contract includes all materials, labor, temporary utilities, site cleanup, warranties, and compliance with Missouri highway specifications, OSHA, ADA, and prevailing‑wage requirements. Bids must be submitted by October 20, 2026, with a mandatory 5 % bid bond and performance/labor‑material bonds equal to the contract price. The project must be completed within 180 calendar days after a Notice to Proceed is issued. • Scope: demolition (if required), fabrication, delivery, installation, and final inspection of a 105‑ft, 11‑ft wide pedestrian bridge. • Required experience: minimum 5 years in prefabricated truss bridge fabrication/installation. • Bonds: 5 % bid bond; 100 % performance and labor‑material bonds. • Prevailing‑wage compliance (Missouri Division of Labor Standards Order 33). • Mandatory pre‑bid conference/site walk on October 9, 2026 (attendance encouraged). • Submission formats: sealed paper envelope or electronic upload via city e‑bidding portal. • Project timeline: up to 180 days from Notice to Proceed; liquidated damages $500/day for delays.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Brittany Miller(Procurement Officer)

[email protected]

(573) 874-7687

Key dates

Opened
9/29/2026
Questions due
10/9/2026
Pre-bid meeting
10/9/2026
Closes
11/10/2026
Duration
180 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
90/2026 Addendum 1

Budget estimate

$500,000 – $1,500,000

No contract value is disclosed in the solicitation. Based on typical costs for a 105‑ft prefabricated pedestrian bridge—including design, fabrication, site preparation, utilities, labor, bonds, and contingency—similar municipal bridge projects in the Midwest range from roughly $500,000 to $1.5 million. The lower bound assumes a basic bridge with minimal site challenges; the upper bound accounts for higher material costs, complex site conditions, and extensive warranty/bond requirements.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Columbia·Missouri

Top match · 99%

Replacement of Bridge 9 on MKT Trail

Closes 10/20/2026Opened 9/29/2026

Missouri Department of Transportation·Missouri

84% match

SW District, City of Carthage, Replacement of bridge on 3rd Street

Closes 10/20/2026Opened 9/17/2026

Missouri Department of Transportation·Missouri

83% match

SE District, St, Francois County, King School Road Replacement

Closes 11/10/2026Opened 10/15/2026

Missouri Department of Transportation·Missouri

83% match

SW District, City of Carthage, 3rd Street Bridge over Spring River Tributary

Closes 10/20/2026Opened 9/16/2026

Missouri Department of Transportation·Missouri

83% match

STL District, Franklin County, removal of the bridge (3 large, corrugated steel culvert pipes) on Schuchart Road over Birch Creek and provides for excavations, pile driving, bridge construction, etc.

Closes 10/29/2026Opened 9/23/2026

BREC·Louisiana

83% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 10/27/2026Opened 9/30/2026

Missouri Department of Transportation·Missouri

83% match

STL District, City of St. Louis, Union Lindell Bridge Reconstruction

Closes 10/20/2026Opened 9/14/2026

City of St. Louis Board of Public Service·Missouri

82% match

Removal & Replacement of Southwest & Columbia Bridges

Closes 11/10/2026Opened 10/7/2026

Missouri Department of Transportation·Missouri

82% match

STL District, City of St. Louis, Removal and Replacement of Southwest and Columbia Bridges

Closes 11/10/2026Opened 10/7/2026

Daviess County·Missouri

82% match

Daviess County: Bridge Replacement - Bridge No. 3960007; BRO-R031 (002); Forest Avenue

Closes 11/18/2026Opened 10/16/2026

City of Carthage·Missouri

82% match

BRO-R117002 - 3rd Street Bridge over Spring River Tributary

Closes 10/20/2026Opened 10/16/2026

Delaware River Joint Toll Bridge Commission·New Jersey

81% match

Portland - Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

Cobb County, GA·Georgia

81% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

U.S. Department Of Defense·Missouri

81% match

Missouri Valley Levee Repairs

Closes 1/20/2027Opened 1/20/2026

City of St. Louis Board of Public Service·Missouri

81% match

Union/Lindell Bridge Replacement (STP‑9901(663))

Closes 10/27/2026Opened 9/16/2026

Georgia City of Chattahoochee Hills·Georgia

81% match

RFP27-001 Cochran Mill Park Bridge Repair/Replacement

Closes 11/19/2026Opened 10/16/2026

Kansas Department of Transportation - Engineering and Consulting·Kansas

81% match

RFP for 70-105 KA-2130-05 – Lewis and Clark Viaduct – Eastbound

Closes 10/21/2026Opened 10/1/2026

City of Maryville·Missouri

81% match

South Main Trail Connection Project - Maryville, MO

Closes 11/10/2026Opened 10/8/2026

Massachusetts Department of Transportation·Massachusetts

81% match

605323 OXFORD FAP No. HIP(NGB)-004S(015)X Bridge Replacement, O-06-030, (ST 56) Leicester Road ov

Closes 10/20/2026Opened 9/21/2026

Georgia Cobb County Department of Transportation·Georgia

81% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Virginia Department of Transportation·Virginia

81% match

A98_2026 BRIDGE REPLACEMENT

Closes 11/18/2026Opened 9/9/2026

Minnesota Department of Administration·Minnesota

81% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

Missouri Department of Transportation·Missouri

81% match

STL District, City of Frontenac, Removals, clearing and grubbing, grading, excavation, bridge construction, asphalt pavement, pedestrian decorative fence, etc.

Closes 11/2/2026Opened 9/14/2026

Massachusetts Town of Ashland·Massachusetts

80% match

Construction and Installation of 2 Riverwalk Bridges

Closes 10/29/2026Opened 10/8/2026

Missouri Department of Transportation·Missouri

80% match

SE District, St. Francois County, Silver Springs Road Bridge Replacement

Closes 11/10/2026Opened 10/15/2026