Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Texas
  4. ›Construction
  5. ›Street Rehabilitation Citywide - Phase VII

City of Beaumont·Texas

Street Rehabilitation Citywide - Phase VII

Closes in 2 days$445k – $1.3MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Beaumont issued an Invitation to Bid (ITB) for the Phase VII segment of its citywide street rehabilitation program. The scope includes removal of existing concrete curbs and gutters, cement treatment of existing base material, placement of hot‑mix asphalt (HMA) wearing surfaces, stabilization of base layers, repair of flexible pavement, installation of pavement markings, and associated traffic control measures. The bid package lists detailed line items (e.g., prep ROW, concrete removal, cement treatment, HMA Type D, flexible pavement repair, mobilization, barricades, and marking installation) with quantities and units. The estimated project cost is $8.9 million. However, as of October 16 2026 the bid was cancelled and will be re‑issued at a later date. • Project: Citywide street rehabilitation (Phase VII) in Beaumont, TX • Type: Invitation to Bid (now cancelled) • Estimated total construction cost: $8.9 M • Key work items: ROW preparation, concrete removal, cement treatment, HMA surface placement, base stabilization, flexible pavement repair, traffic control, pavement marking, mobilization • Submission deadline (original): 22 Oct 2026, 2:00 PM CT • Questions deadline: 19 Oct 2026, 12:00 PM CT • Primary contact: Julie Hammond, Roadway Designer II (Phone (409) 730‑4411, Email [email protected]) • Status: Cancelled – will be rebid later

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Julie Hammond(Roadway Designer II)

[email protected]

(409) 730-4411

Key dates

Opened
10/1/2026
Questions due
10/19/2026
Closes
10/22/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
PW1027-03 Addendum 1

Budget estimate

$445,000 – $1,335,000

The bid documents cite an estimated total project cost of $8.9 million. Assuming a typical contractor net profit margin of 5‑15 % for municipal pavement projects, the expected earnings for the winning bidder would fall roughly between $445,000 (5 %) and $1,335,000 (15 %). Additional factors that could shift this range include the final award amount after rebidding, change‑order potential, and the specific scope of work a subcontractor may take on.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Beaumont·Texas

Top match · 95%

Street Rehabilitation Citywide - Phase VII

Closes 10/22/2026Opened 10/1/2026

City of Dania Beach·Florida

85% match

Sidewalk Rehabilitation Phase II

Closes 10/26/2026Opened 9/18/2026

City of Lancaster·Texas

84% match

2026 Roadway Reconstruction Projects

Closes 12/16/2026Opened 10/7/2026

Texas Jefferson County·Texas

83% match

Garth Road Reconstruction Phase 1

Closes 11/4/2026Opened 10/13/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

83% match

SALES TAX STREET AND ROAD REHABILITATION PROGRAM PROJECT 21-7 STREETS IN TARA, OXFORD PLACE, SHERWOOD FOREST BLVD, DARRYL DR, BARD, & OAK KNOLL CITY PARISH PROJECT NO. 25-AO-ST-0026

Closes 11/3/2026Opened 10/9/2026

City of Broken Arrow·Oklahoma

83% match

Dallas Street Rehabilitation:

Closes 11/17/2026Opened 9/29/2026

Louisiana City of New Orleans – Department of Public Works·Louisiana

83% match

DPW823 Citywide Major & Minor Streets #1

Closes 10/27/2026Opened 10/1/2026

City of Williamsburg·Virginia

83% match

FY27 Citywide Street Resurfacing For the City of Williamsburg

Closes 10/27/2026Opened 10/5/2026

City of Rancho Cordova·California

83% match

2026 ADA Sidewalk Improvement Project

Closes 10/21/2026Opened 9/30/2026

Webb County·Texas

83% match

Project No. CSJ 0922-33-230

Closes 10/30/2026Opened 10/8/2026

City of Plano·Texas

82% match

Arterial Concrete Repair-Park Boulevard-US 75 to East City Limit, Project No. PW-S-00097

Closes 10/19/2026Opened 9/28/2026

City of Lawrence·Kansas

82% match

6N26000-MS 2026 Neighborhood Traffic Management

Closes 10/20/2026Opened 10/5/2026

Texas City of San Antonio·Texas

82% match

Task Order Contract for the 2027 Pavement Preservation Package 6 – Flatwork

Closes 10/27/2026Opened 9/25/2026

City of Stillwater·Oklahoma

82% match

10th Avenue and Main Street Improvements Project 26TR12

Closes 11/4/2026Opened 10/10/2026

Texas City of San Antonio·Texas

82% match

Texas A&M University Area Streets (Maria Ferrier Ave. to Mauermann Road) Phase 2 (2022 Bond)

Closes 11/3/2026Opened 10/2/2026

City of Newberry, Florida·Florida

82% match

Invitation to Bid 2026-03, City of Newberry SW 254th Street Extension from SW 7th Avenue to SW 10th Avenue

Closes 10/27/2026Opened 9/21/2026

City of Creve Coeur·Missouri

82% match

New Ballas Sidewalk Project - Phase 3

Closes 11/19/2026Opened 10/9/2026

Louisiana City of Baton Rouge and Parish of East Baton Rouge·Louisiana

82% match

CORA DRIVE SIDEWALK IMPROVEMENTS PROJECT

Closes 11/17/2026Opened 10/14/2026

Missouri Department of Transportation·Missouri

82% match

STL District, City of Arnold, Reconstruction of Pomme Road from Lonedell Road to just east of Rockview Lane, including new concrete pavement, etc.

Closes 10/28/2026Opened 9/24/2026

City of Williamsburg·Virginia

82% match

IFB 08 4101 27 FY27 Citywide Street Resurfacing

Closes 10/27/2026Opened 10/5/2026

Town of Church Point·Louisiana

82% match

2026-27 ROAD IMPROVEMENTS PROJECT PHASE 1

Closes 11/10/2026Opened 10/14/2026

City of Philadelphia·Pennsylvania

82% match

PW Prequalification Bid #3085 - 2800 Judson Street Rehabilitation Project

Closes 11/5/2026Opened 10/16/2026

Texas City of San Antonio·Texas

81% match

Vance Jackson (Loop 410 to Adrian Drive) (2022 Bond)

Closes 11/3/2026Opened 10/2/2026

City of San Antonio·Texas

81% match

23-03921A Texas A&M University Area Streets (Maria Ferrier Ave. to Mauermann Rd) Phase 2 (2022 Bond)

Closes 11/3/2026Opened 10/2/2026

LA Public Works Engineering Bureau·California

81% match

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026