Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Missouri
  4. ›Closed bids
  5. ›2026 Park Pipe Replacement Project - Kearney, MO

City of Kearney·Missouri

2026 Park Pipe Replacement Project - Kearney, MO

Closes 3/19/2026$500k – $1.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Kearney is seeking sealed bids for a comprehensive pipe‑replacement project in its municipal park system. The work includes removing existing underground pipework, disposing of the old material, procuring new pipe and related components, and installing the new system with all necessary backfill, testing, and restoration of the site. All bidders must obtain the full set of plans and specifications from Drexel Technologies and comply with a range of contractual provisions, including licensing, insurance, bonding, prevailing‑wage, OSHA training, and various federal and local compliance requirements. Site visits are scheduled prior to the bid deadline to allow contractors to assess existing conditions. • Remove and dispose of existing underground park pipes. • Supply, install, and test new water/sewer pipe infrastructure, including all fittings, valves, and ancillary materials. • Perform site restoration and ensure compliance with City of Kearney specifications and local regulations. • Provide required documentation: business license, insurance, bid guarantee, payment bond, prevailing‑wage certification (if applicable), OSHA training records, E‑Verify proof, and other listed provisions. • Bids are due 3/19/2026 2:00 PM; questions due 3/10/2026 2:00 PM; mandatory site‑visit by 3/11/2026 3:00 PM.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Loren Snyder(City Engineer)

[email protected]

(816) 903-4735

Key dates

Opened
3/3/2026
Questions due
3/10/2026
Site visit
3/11/2026
Closes
3/19/2026

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110

Budget estimate

$500,000 – $1,500,000

While the solicitation does not disclose a budget, similar municipal pipe‑replacement projects for a small city typically range from $0.5 million to $1.5 million depending on pipe length, diameter, site conditions, and material costs. Assuming 1,200–2,500 linear feet of 12‑inch pipe, moderate soil conditions, and standard material pricing, the total contract value is likely to fall within the $500,000–$1,500,000 bracket.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Kearney·Missouri

Top match · 76%

Mack Porter Park Connector Shared Use Path - Kearney, MO

Closes 11/3/2026Opened 10/6/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

73% match

WTP Pipe Gallery Replacement - St. Charles County, MO

Closes 11/18/2026Opened 10/1/2026

City of Billings·Montana

73% match

Evergreen Park Irrigation System Replacement

Closes 11/4/2026Opened 10/8/2026

Missouri Department of Transportation·Missouri

73% match

KC District, City of Kearney, Mack Porter Park Connector Shared Use Path

Closes 11/3/2026Opened 10/7/2026

Georgia City of Walnut Grove·Georgia

72% match

FY 2027 Park Street Drainage Repair Project

Closes 10/14/2026Opened 9/11/2026

Clark County·Nevada

72% match

Indian Springs Park Baseball Field Irrigation Replacement

Closes 10/26/2026Opened 9/22/2026

Laurens Commission of Public Works·South Carolina

71% match

STEEL MAIN REPLACEMENT PROGRAM - PHASE VI

Closes 10/29/2026Opened 9/28/2026

Douglas County·Nebraska

71% match

Lake James Park Renovation

Closes 10/28/2026Opened 10/7/2026

City of Aiken·South Carolina

71% match

City of Aiken, S.C. Citizens Park 1 Irrigation Replacement

Closes 10/30/2026Opened 10/10/2025

City of Kenosha·Wisconsin

71% match

Project 26-1429 Roosevelt Park Splashpad

Closes 10/14/2026Opened 9/24/2026

City of Walterboro·South Carolina

70% match

Middle Ireland Creek Sewer Trunk Line Rehabilitation

Closes 10/27/2026Opened 9/25/2026

Nevada Government·Nevada

70% match

Indian Springs Park - Baseball Field Irrigation Replacement

Closes 10/26/2026Opened 9/22/2026

City of Daytona Beach·Florida

70% match

2701TB - Tomoka Farms Road & Bellevue Avenue Watermain Realignment Project

Closes 10/29/2026Opened 10/1/2026

Columbia County·Wisconsin

70% match

Wyona Park Restroom Plumbing Project

Closes 11/12/2026Opened 9/28/2026

Northern Kentucky Water District·Kentucky

70% match

Amsterdam Road Water Main Replacement

Closes 1/31/2027Opened 10/13/2026

Iowa Dept Of Natural Resources·Iowa

70% match

Lagoon Liner Replacement (Rebid), Pikes Peak State Park, Clayton County

Closes 10/22/2026Opened 9/30/2026

City of Thousand Oaks·California

70% match

Moorpark Road Storm Drain Pipe (CMP) Lining and Repair at Pembridge Street (MI 2623)

Closes 10/21/2026Opened 9/18/2026

Arkansas

70% match

NW Park Tree Replacement

Rolling / TBD closeOpened 8/30/2026

City of Charlottesville·Virginia

70% match

MEADOWCREEK GOLF COURSE IRRIGATION PUMP/MOTOR ASSEMBLY REPLACEMENT (2)

Closes 10/16/2026Opened 9/18/2026

Missouri Office of Administration·Missouri

70% match

Water Supply System - Bryant Creek State Park

Closes 10/22/2026Opened 10/8/2026

Missouri Department of Transportation (MoDOT) Southwest District·Missouri

70% match

Polypropylene Pipe - I-44 Corridor Area - Southwest District

Closes 10/20/2026Opened 10/6/2026

Missouri Department of Transportation·Missouri

70% match

FY27 SW Ozark Maintenance Building Metal Siding Replacement Project

Closes 10/20/2026Opened 9/29/2026

North Carolina Union County·North Carolina

70% match

IFB 2027-006, Union County Cane Creek Park Culvert Replacement

Closes 10/20/2026Opened 9/18/2026