The Town of Hampton, NH is seeking a qualified architecture/engineering and/or planning firm to conduct a space and needs analysis, preliminary design, and preliminary cost analysis for a new Public Works Facility. The scope of work includes a space needs analysis, site analysis, existing building reuse/renovation recommendations, and preliminary conceptual design alternatives. The selected consultant will be required to assist the Town in recommending an appropriate footprint and layout for the new facility, considering current and future space needs. The project is expected to be completed by October 31, 2026.
• The new facility will provide space for Sewer & Drain, Highway, and Vehicle Maintenance operations.
• The facility will include various rooms and areas, such as vehicle/equipment maintenance bays, small equipment/gantry bay, welding/fabrication bay, paint bay/booth, wash bay, chemical storage, tire storage & tire repair area, tools, parts & supply storage, custodial supplies storage, building & grounds workshop, unisex restroom, mechanical room, plow & sander storage area, bunk room, training/lunchroom, full kitchen, conference room, restrooms with showers and lockers, office space, and public reception area.
• The consultant will be required to provide recommendations on HVAC options for the new facility, including a waste oil burner and air conditioning for the entire building.
• The maximum funding available for the project is $75,000, inclusive of labor and all project expenses.