Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Colorado guideColorado Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Colorado
  4. ›Closed bids
  5. ›Wastewater Reclamation Facility (WRF) Switchgear Replacement

City of Pueblo·Colorado

Wastewater Reclamation Facility (WRF) Switchgear Replacement

Closes 8/5/2026$500k – $1.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Pueblo is soliciting bids for the replacement of the main medium voltage switchgear at the James R. DiIorio Water Reclamation Facility (WRF) and reliability improvements to the two incoming 13.2kV utility services. The work includes furnishing of all labor, materials, and equipment for the supply, delivery, fabrication, installation, testing, and other materials and services required for the work. Specific features include replacement of existing fused cutouts, replacement of the plant's 13.2kV metal-enclosed main-tie-main fusible main switchgear lineup, reconnection and testing of existing incoming and outgoing underground 15kV cables, and modification to existing switchgear vault trench covers. • Replacement of existing fused cutouts on the two incoming 13.2kV utility services with solid blade cutouts • Replacement of the plant’s 13.2kV metal-enclosed main-tie-main fusible main switchgear lineup with two padmount vacuum fault interrupter switchgear • Reconnection and testing of existing incoming and outgoing underground 15kV cables to the new switchgear • Modification to existing switchgear vault trench covers to accommodate the new switchgear layout • Development and implementation of protective relay settings to coordinate with the upstream electric utility protection and downstream loads in the WRF • Provision, installation, and operation of temporary equipment necessary to facilitate the work

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Andra Ahrens(Director of Purchasing)

[email protected]

(719) 553-2896

Key dates

Opened
7/14/2026
Questions due
7/28/2026
Pre-bid meeting
7/21/2026Mandatory
Site visit
7/21/2026Mandatory
Closes
8/5/2026
Duration
240 days

Last updated

Details

Type
Invitation for Bid
Industry
Energy and Utilities
NAICS
221112
Solicitation №
26-043

Budget estimate

$500,000 – $1,500,000

The budget for this project is estimated to be around $500,000 to $1,500,000, based on the scope of work and the fact that the City of Pueblo has a budget for such projects. The actual budget may vary depending on the bids received and the final contract award. Factors that may influence the budget include the complexity of the work, the materials and equipment required, and the labor costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Olmsted County·Minnesota

Top match · 71%

Switchgear Controls Replacement

Closes 10/13/2026Opened 9/4/2026

Town of Narragansett·Rhode Island

70% match

Stand-by Generator Replacement - WWTP

Closes 11/6/2026Opened 11/6/2026

Olmsted County·Minnesota

70% match

Switchgear Controls Replacement

Closes 10/30/2026Opened 9/4/2026

Olmsted County·Minnesota

70% match

Switchgear Controls Replacement

Closes 10/13/2026Opened 9/4/2026

City of Pueblo·Colorado

70% match

Replacement of Johnson Control Actuator Valves at WRF

Closes 10/14/2026Opened 9/23/2026

Olmsted County·Minnesota

69% match

Switchgear Controls Replacement

Closes 10/13/2026Opened 9/4/2026

City of Pembroke Pines·Florida

69% match

CDBG-MIT Waste Water Treatment Plant Emergency Power System Replacement

Closes 10/20/2026Opened 8/28/2026

City of Hayward·California

69% match

WRRF West Substation Transformer Repair

Closes 10/28/2026Opened 10/9/2026

Palm Beach County Water Utilities Department·Florida

68% match

WRWWTF Electrical Building Progressive Design-Build

Closes 11/12/2026Opened 9/23/2026

NYS OGS Design & Construction - Construction Contractors·New York

68% match

Provide Switchgear & Control System Modification – Five Points Correctional Facility (46151‑E Electrical)

Closes 10/21/2026Opened 9/23/2026

City of Springfield, OH - Purchasing·Ohio

68% match

26-35 Medium-Voltage Transformer Replacement at the Springfield Wastewater Treatment Plant

Closes 10/30/2026Opened 9/25/2026

City of Charlotte·North Carolina

68% match

McAlpine Creek WRRF Digesters Rehabilitation

Rolling / TBD closeOpened 7/15/2027

City of Homestead·Florida

68% match

ITB# 202636-Purchase of Two (2) Low Voltage Switchboards for Wastewater Treatment Plant Backup Generators (Re-Bid)

Closes 10/13/2026Opened 9/18/2026

General Services, NYS Office of·New York

68% match

Provide Switchgear & Control System Modification

Closes 10/21/2026Opened 9/24/2026

U.S. Department Of Veterans Affairs·Ohio

67% match

J061--Sources Sought Emergency Switchgear Repairs 539

Closes 10/21/2026Opened 10/7/2026

Town of Tyrone·Georgia

67% match

2026 Generator Replacement Sewer Pump Station #3

Closes 11/4/2026Opened 10/5/2026

Corrections and Community Supervision, NYS Dept. of·New York

67% match

Switchgear Cleaning/Testing and Partial Discharge Testing

Closes 11/4/2026Opened 9/1/2026

City of Billings·Montana

67% match

W.O. 26-08: WRF Digester Gas Pipe Replacement

Closes 11/4/2026Opened 10/1/2026

New York City Department of Environmental Protection·New York

67% match

82625B0045-BWT-BB-236 Replacement of the Cyclone Degritters and Grit Washers at the Bowery Bay WWTP

Closes 10/28/2026Opened 9/28/2026

Town of Narragansett·Rhode Island

67% match

Stand-by Generator Replacement - Wastewater Treatment Plant

Closes 11/6/2026Opened 10/9/2026

City of Worcester·Massachusetts

67% match

Generator Replacement - Union Station / WRA

Closes 10/28/2026Opened 9/21/2026

City of Richland·Washington

66% match

Metalclad Switchgear - Sandhill Crane Substation Bank 3

Closes 11/3/2026Opened 9/27/2026

West Basin Municipal Water District·California

66% match

Torrance Refinery Water Recycling Plant Programmable Logic Controller Replacements

Closes 11/5/2026Opened 9/23/2026

Georgia Macon Water Authority·Georgia

66% match

Rebuild Gravity Thickeners 1,2 and 3 and Clarifier #6 at Rocky Creek WRF

Closes 10/20/2026Opened 9/2/2026

Corrections and Community Supervision, NYS Dept. of·New York

66% match

Electrical Switchgear Testing Washington Correctional

Closes 1/7/2027Opened 9/18/2026