The City of Boise is seeking a qualified contractor to design, construct, and commission a new 800 gpm lift station at the existing Willow Lane site. The work includes civil site grading, wet‑well and valve‑vault construction, installation of submersible pumps, new electrical facilities, de‑watering, bypass pumping, demolition of the existing dry well, and all associated utility, structural, and storm‑water controls. The contract will be awarded on a sealed‑bid basis through the JAGGAER electronic platform, with a 5 % bid‑bond requirement and mandatory Idaho Public Works licensing for any self‑performed plumbing, HVAC, or electrical work.
• New 800 gpm lift station with wet‑well, submersible pumps, valve vault, and electrical shelter.
• Comprehensive civil, structural, mechanical, and electrical scope including de‑watering, bypass pumping, demolition, erosion‑control, and permitting.
• Mandatory electronic submission via JAGGAER, 5 % bid bond, and required licensing/subcontractor disclosures.