Description
The Washoe County School District is soliciting architectural firms for the Sparks High School Modernization Project. The services will be provided in two phases. Phase 1 shall include programming, feasibility, and concept design while Phase 2 will consist of full architecture/engineering design services in collaboration with a Construction Manager at Risk.
Key aspects of the project include:
• Programming, feasibility, and concept design in Phase 1
• Full architecture/engineering design services in Phase 2
• Collaboration with a Construction Manager at Risk
• Mandatory pre-bid meeting on November 20, 2025, at 3:00 pm local time
• Submission deadline on December 17, 2025
Attached files
The solicitation documents live at the source — open the bid source above to download them.
Contact
Aprile Anderson(Buyer II)