Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Missouri
  4. ›Closed bids
  5. ›Courtney Bend WTP Reclaim Basin Restoration

City of Independence·Missouri

Courtney Bend WTP Reclaim Basin Restoration

Closes 8/11/2026$500k – $2MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Independence, Missouri, invites bids for the restoration of the Wash Water Reclaim Basin No. 2 at the Courtney Bend Water Treatment Plant. The project includes the removal and disposal of lime residuals, excavation, and site restoration. The contractor will be responsible for providing all labor, equipment, materials, and services required for the project. The city is looking for a firm with experience in heavy civil construction, water treatment infrastructure, or water treatment residuals management. The project is expected to be completed within 120 calendar days of the notice to proceed. Key aspects of the project include: • Removal of lime residuals from the reclaim basin • Excavation and grading of the site • Site restoration, including seeding and erosion control • Compliance with Missouri Prevailing Wage Law • Provision of a one-year Payment, Performance, and Maintenance Bond • Compliance with all applicable laws, regulations, and ordinances

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Merri Meade(Bid Contact)

[email protected]

(816) 325-2214

Key dates

Opened
7/15/2026
Pre-bid meeting
7/30/2026
Site visit
7/30/2026
Closes
8/11/2026
Duration
120 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237110
Solicitation №
26036

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of work and the requirements for the contractor. The project includes the removal and disposal of lime residuals, excavation, and site restoration, which are labor-intensive and require specialized equipment. The city is looking for a firm with experience in heavy civil construction, water treatment infrastructure, or water treatment residuals management, which suggests that the project will require a significant amount of resources and expertise. Based on these factors, a rough estimate for the budget could be between $500,000 and $2,000,000. This estimate takes into account the cost of labor, equipment, materials, and overhead, as well as the potential for change orders and unforeseen expenses.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Village of Hoffman Estates·Illinois

Top match · 66%

Community Park Pond Restoration Project

Closes 10/14/2026Opened 9/21/2026

U.S. Natural Resources Conservation Service·United States of America

66% match

Easement Restoration and Stewardship

Closes 11/19/2026Opened 9/25/2026

City of Roseville·California

65% match

Construction Services: DCWWTP Primary Sedimentation Basin Rehabilitation Project

Closes 10/27/2026Opened 8/25/2026

Town of Westwood·Massachusetts

65% match

Catch Basin Cleaning

Rolling / TBD closeOpened 9/9/2026

East Bay Municipal Utility District·California

65% match

Mokelumne River Floodplain Habitat Restoration Project

Closes 11/6/2026Opened 9/21/2026

James City County·Virginia

65% match

Landing Circle Stream Restoration

Closes 10/21/2026Opened 9/23/2026

City of Charlotte·North Carolina

65% match

Newell Stream Restoration Project

Rolling / TBD closeOpened 7/15/2026

City of Waco·Texas

64% match

Flat Creek Reuse Project Phase 1A

Closes 12/1/2026Opened 10/2/2026

Western Municipal Water District·California

64% match

WWRF RW Pond Erosion Prevention Project

Closes 10/15/2026Opened 9/15/2026

California Grants·California

64% match

Proposition 1 Watershed Restoration Grant Program

Rolling / TBD closeOpened 6/18/2025

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

64% match

Rehabilitation of STP – Fine Screen, Blowers, Paint Tanks – Cowans Gap State Park

Closes 10/29/2026Opened 10/1/2026

State of West Virginia·West Virginia

64% match

OSR Buffalo Coal Company C1 EQ Basin Project S-2003-03

Closes 10/20/2026Opened 10/2/2026

U.S. Virgin Islands GVIBUY·U.S. Virgin Islands

64% match

Spring Gut Road Bridge Replacement

Closes 10/14/2026Opened 8/24/2026

Sedgwick County·Kansas

64% match

801-C-4200; N 151st St W Bridge Over Eagle Drainage Ditch

Closes 10/27/2026Opened 10/27/2026

State of West Virginia·West Virginia

64% match

OSR Buffalo Coal Company C1 EQ Basin Project S-2003-03

Closes 10/20/2026Opened 10/6/2026

City of Green Bay·Wisconsin

64% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Woodbury, Minnesota·Minnesota

64% match

Powers Lake Vegetation Restoration

Closes 10/21/2026Opened 10/3/2026

U.S. Department Of The Interior·New Mexico

64% match

Y--NGWSP Cutter Lateral Reach 21 Booster Plant

Closes 10/30/2026Opened 9/30/2026

Virginia Tech·Virginia

64% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/3/2026Opened 10/6/2026

City of National City·California

64% match

Paradise Creek TRM and BMP Repairs (Non-PLA)

Closes 10/15/2026Opened 9/25/2026

Metropolitan Council·Minnesota

64% match

Coon Rapids 4-NS-525 Rehabilitation

Closes 11/3/2026Opened 9/24/2026

City of Beaver Dam, WI·Wisconsin

64% match

CTH W & Easement Watermain Extension

Closes 10/14/2026Opened 10/2/2026

Massachusetts Department of Transportation·Massachusetts

64% match

612193 ANDOVER FAP No. HIP(NGB)-0934(003) Bridge Preservation, A-09-022, I-93 over Merrimack River

Closes 11/3/2026Opened 8/24/2026

Georgia City of Covington·Georgia

64% match

#2026-20 Pace Street Floodplain Restoration

Closes 10/20/2026Opened 8/17/2026

California Grants·California

64% match

Watershed Resilience Conservation Implementation

Rolling / TBD closeOpened 8/4/2026