Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Louisiana guideLouisiana Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Louisiana
  4. ›Boudreaux Canal Crossing Waterline Replacement TPCW Project No. H.0…

Terrebonne Parish Consolidated Waterworks District No. 1·Louisiana

Boudreaux Canal Crossing Waterline Replacement TPCW Project No. H.002244

Closes 11/10/2026$200k – $500kInvitation for BidLogin required
Get bids like this by emailBid source

Description

The project calls for the replacement of an existing waterline crossing beneath Boudreaux Canal. Work includes horizontal directional drilling (HDD) of an 8‑inch HDPE waterline across the canal and open‑cut installation of two 6‑inch C900 PVC waterline sections, along with all fittings, connections, and integration with the existing water system. Bidders must hold a valid Louisiana contractor’s license for the appropriate classifications, provide a 5 % bid bond or certified check, and submit bids on the Louisiana Uniform Public Works Bid Form. The successful contractor will be required to coordinate with the district’s engineers, adhere to all local utility and environmental regulations, and complete the work within the schedule set by the district. • Horizontal directional drilling of an 8‑in. HDPE line across Boudreaux Canal. • Open‑cut placement of two 6‑in. PVC waterline sections with fittings and connections. • Mandatory submission of a 5 % bid bond or certified payment; licensing compliance required. • Pre‑bid conference on 22 Oct 2026; bids due 10 Nov 2026.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Melanie B. Caillouet

[email protected]

Key dates

Opened
10/13/2026
Pre-bid meeting
10/22/2026
Closes
11/10/2026

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
747671

Budget estimate

$200,000 – $500,000

No contract value is disclosed, but based on typical costs for an 8‑inch HDPE line and associated PVC sections, mobilization, HDD services, and labor in Louisiana, the project is likely to fall between $200,000 and $500,000. Factors influencing the range include length of the crossing, site access conditions, material prices, and any required traffic control or environmental mitigation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Louisiana Jefferson Parish Purchasing Department·Louisiana

Top match · 84%

JEFFERSON PARISH WATERLINE IMPROVEMENTS SOUTH NEW ORLEANS SUBDIVISIO

Closes 11/17/2026Opened 10/7/2026

Jefferson Parish Government·Louisiana

83% match

Bid Event # 185 - JEFFERSON PARISH WATERLINE IMPROVEMENTS SOUTH NEW ORLEANS SUBDIVISION JEFFERSON PARISH PROJECT NO. 2023-028-WRB

Closes 11/17/2026Opened 10/7/2026

Consolidated Waterworks District No. 1 of Pointe Coupee Parish·Louisiana

83% match

Consolidated Waterworks District No. 1 of Pointe Coupee Parish - Contract No. 2 Water Distribution System Improvements (Riverbend Subdivision) Water Sector Program, Phase 2 (Re-Advertisement)

Closes 10/27/2026Opened 9/24/2026

Consolidated Waterworks District No. 1 of Pointe Coupee Parish·Louisiana

83% match

Consolidated Waterworks District No. 1 of Pointe Coupee Parish - Contract No. 3 Water Distribution System Improvements (Lemoine's Trailer Park) Water Sector Program, Phase 2 (Re-Advertisement)

Closes 10/27/2026Opened 9/24/2026

Town of Kershaw·South Carolina

83% match

Lynches River Waterline Bore

Closes 10/22/2026Opened 9/25/2026

Consolidated Waterworks District No. 1 of Pointe Coupee Parish·Louisiana

82% match

Consolidated Waterworks District No. 1 of Pointe Coupee Parish - Contract No. 1 Water Distribution System Improvements (LA Hwy 78) Water Sector Program, Phase 2 (Re-Advertisement)

Closes 10/27/2026Opened 9/24/2026

Georgia City of Bostwick·Georgia

81% match

ITB BOSTWICK WATER LINE REPLACEMENT

Closes 10/22/2026Opened 9/22/2026

City of Columbus Ohio·Ohio

81% match

Parsons Avenue Water Plant – CW112 Raw Water Line (Invitation for Bid)

Closes 11/4/2026Opened 10/6/2026

City of Fort Wayne·Indiana

81% match

67680 - Tract 10 Lead Service Line and WMR

Closes 10/22/2026Opened 10/2/2026

City of Fort Wayne·Indiana

80% match

67616 - Tract 11 Lead Service Line and WMR

Closes 10/29/2026Opened 10/9/2026

U.S. Department Of Defense·Louisiana

80% match

LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)

Closes 10/19/2026Opened 7/27/2026

City of Farmers Branch·Texas

80% match

Waterline Replacement Engineering Design

Closes 11/3/2026Opened 10/1/2026

City of Lake Charles·Louisiana

80% match

Shell Beach Drive Bridge over Pithon Coulee Repair – CP3445

Closes 10/20/2026Opened 9/24/2026

City of DeLand·Florida

80% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

City of Beaverton·Oregon

80% match

Erickson Ave Waterline Replacement (2nd St to 5th St)

Closes 10/21/2026Opened 9/30/2026

U.S. Department Of Defense·Louisiana

80% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

City of Fort Wayne·Indiana

80% match

67687 - Tract 5 North Lead Service Replacement and WMR

Closes 10/15/2026Opened 9/25/2026

City of Kingsport·Tennessee

80% match

Poplar Grove/Mill Creek Waterline Upgrades

Closes 10/29/2026Opened 10/10/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

80% match

Western Transmission Main Phase 3C - St. Charles County, MO

Closes 10/15/2026Opened 8/25/2026

U.S. Department Of Defense·Louisiana

80% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Louisiana

80% match

Port Fourchon Navigation Channel, Maintenance Dredging FY26, Lafourche Parish, LA

Closes 4/7/2028Opened 3/23/2026

City of Riverton·Wyoming

80% match

West Pershing Avenue Waterline Replacement Project

Closes 10/14/2026Opened 9/30/2026

City of Wellington·Kansas

80% match

Wellington Highway 160 Waterline - Wellington, KS

Closes 10/27/2026Opened 10/13/2026

U.S. Department Of The Interior·Utah

80% match

EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/4/2026