Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Vermont guideVermont Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Vermont
  4. ›Closed bids
  5. ›Westcott Brook Floodplain Restoration Implementation

Franklin County Natural Resources Conservation District·Vermont

Westcott Brook Floodplain Restoration Implementation

Closes 7/1/2026$200k – $500kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Franklin County Natural Resources Conservation District is requesting bids from qualified contractors for the restoration of a floodplain on Westcott Brook in Franklin, Vermont. The project involves the reconnection of the existing floodplain through selective berm removal and strategic wood addition. The work includes berm removal, strategic wood additions, and shrub plantings and site stabilization/restoration. The project has a mandatory pre-bid site visit scheduled for June 17th at 3:00 PM, and questions about the scope of work should be emailed to the contact person by June 19, 2026. The bid proposals shall detail the confirmation that all elements of the scope of work and schedule can be met, provide up to three examples of work on projects similar to this scope of work, and a not-to-exceed lump sum cost proposal. • The project has a completion date of October 1, 2026. • The contractor shall maintain insurance coverages, including workers' compensation, general liability, and automotive liability. • The contractor shall name FCNRCD as additional insureds for liability arising out of this project.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Mel Auffredou(Contact Person)

[email protected]

(802) 582-3133

Key dates

Opened
6/9/2026
Questions due
6/19/2026
Pre-bid meeting
6/17/2026Mandatory
Site visit
6/17/2026Mandatory
Closes
7/1/2026
Projected award
7/21/2026
Duration
84 days

Last updated

Details

Type
Request for Proposal
Industry
Environmental Services
NAICS
562910
Solicitation №
73846

Budget estimate

$200,000 – $500,000

The budget for this project can be estimated based on the scope of work, which includes berm removal, strategic wood additions, and shrub plantings and site stabilization/restoration. The cost of these services can vary depending on the location, materials, and labor required. However, based on industry standards, a rough estimate for this type of project could be between $200,000 and $500,000. The factors that may influence the likely payment range include the complexity of the project, the experience and qualifications of the contractor, and the availability of materials and labor.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

James City County·Virginia

Top match · 70%

Landing Circle Stream Restoration

Closes 10/28/2026Opened 9/23/2026

James City County·Virginia

68% match

Landing Circle Stream Restoration

Closes 10/21/2026Opened 9/23/2026

East Bay Municipal Utility District·California

68% match

Mokelumne River Floodplain Habitat Restoration Project

Closes 11/6/2026Opened 9/21/2026

Massachusetts Town of Westport·Massachusetts

67% match

Old County Road & East Branch Flood Resilience Study

Closes 10/29/2026Opened 10/8/2026

City of Charlotte·North Carolina

67% match

Newell Stream Restoration Project

Rolling / TBD closeOpened 7/15/2026

California Grants·California

67% match

Watershed Resilience Conservation Implementation

Rolling / TBD closeOpened 8/4/2026

Village of Hoffman Estates·Illinois

66% match

Community Park Pond Restoration Project

Closes 10/14/2026Opened 9/21/2026

Sustainable Woodstock·Vermont

66% match

Barnard Brook at Woodstock Garden Bank Stabilization

Closes 10/20/2026Opened 9/17/2026

Environmental Conservation, NYS Department of·New York

66% match

Hudson River Estuary Round 50 Tributary Restoration and Resiliency

Closes 12/17/2026Opened 9/25/2026

California Grants·California

66% match

Urban Streams Restoration Program

Rolling / TBD closeOpened 10/1/2026

City of Anderson·South Carolina

66% match

Branchcliff Lane Streambank Stabilization

Closes 11/2/2026Opened 10/12/2026

Massachusetts Department of Transportation·Massachusetts

66% match

608861 WESTFORD Bridge Rehabilitation, W-26-002, Stony Brook Road over the Stony Brook

Closes 10/14/2026Opened 8/31/2026

City of Dunedin·Florida

65% match

Willow Wood Village Water Main Replacement

Closes 10/19/2026Opened 9/18/2026

Georgia City of Covington·Georgia

65% match

#2026-20 Pace Street Floodplain Restoration

Closes 10/20/2026Opened 8/17/2026

Massachusetts Department of Transportation·Massachusetts

65% match

612193 ANDOVER FAP No. HIP(NGB)-0934(003) Bridge Preservation, A-09-022, I-93 over Merrimack River

Closes 11/3/2026Opened 8/24/2026

City of Beaver Dam·Wisconsin

65% match

CTH W & Easement Watermain Extension

Closes 10/14/2026Opened 10/2/2026

City of Charlotte·North Carolina

65% match

Valleybrook Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/15/2027

City of Woodbury, Minnesota·Minnesota

65% match

Powers Lake Vegetation Restoration

Closes 10/21/2026Opened 10/3/2026

Virginia Tech·Virginia

65% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/3/2026Opened 10/6/2026

North Carolina Town of Wilkesboro·North Carolina

65% match

ITB Cub Creek Phase 3 Stream Restoration

Closes 10/19/2026Opened 9/14/2026

U.S. Department Of Defense·Illinois

65% match

DUTCH GAP AQUATIC ECOSYSTEM RESTORATION, ANTIOCH, LAKE COUNTY, ILLINOIS

Closes 8/8/2028Opened 8/12/2025