This solicitation calls for the complete electrical rehabilitation of the secondary clarifier system at the Jackson Pike AâPlant waterâreclamation facility, including replacement of outdated equipment, installation of new motorâcontrol centers, PLCs, wiring, conduit, and related control instrumentation, plus miscellaneous improvements needed to finish the project. The work is scoped under the Cityâs standard construction specifications and must meet a 5.4 % DBE participation goal. Bids are accepted exclusively through the electronic BidExpress platform; a bid bond of 10 % of the total bid amount is required, and preâqualification is mandatory for contracts exceeding $500 k.
⢠Upgrade and replace secondary clarifier electrical and control equipment, including PLCs, motorâcontrol centers, and associated wiring.
⢠Provide all required civil, structural, and mechanical modifications (demolition, concrete work, conduit installation, pipe fitting) to support the new electrical system.
⢠Comply with extensive City specifications, DBE goals, safety, environmental, and insurance requirements; submit a detailed bid package (bid bond, proposal signature affidavit, and required forms) via BidExpress by the September 30, 2026 deadline.