Description
Albuquerque Public Schools is seeking a professional architectural/engineering firm to provide full‑service design and construction administration for a new 114,645 gsf gymnasium at Eldorado High School, including site‑utility improvements, ball‑field concessions, and demolition of the existing gym. The scope covers programming, schematic, design development, construction documents, bidding, and construction administration, with a requirement to meet LEED Silver and Energy Star ≥ 75 standards. Fees are based on a percentage of the Maximum Allowable Construction Cost (MACC) of $59,475,416, with the fee percentage to be negotiated (baseline guidance is ~10%). The contract will be awarded after evaluation of qualifications, and the design phase is expected to last about twelve months.
• Design‑build services for a new K‑12 gymnasium (~115 k sf) and associated site work.
• Full project phases: 0 & 1A (site prep), 1B (new gym construction), 1C (demolition of old gym).
• Fee based on a percentage of MACC ($59.5 M); baseline guidance 10 % (≈ $6 M) but negotiable.
• Required compliance with APS design standards, LEED Silver, and Energy Star ≥ 75.
• Proposal limited to 20 pages (excludes covers, dividers, transmittal, required forms).
Attached files
The solicitation documents live at the source — open the bid source above to download them.