The State of West Virginia’s Office of Special Reclamation is issuing a Request for Quote to perform a comprehensive reclamation and infrastructure upgrade on the Buffalo Coal Company C1 EQ Basin (Permit S‑2003‑03) located in Grant County near Mount Storm. The scope includes mobilization, site preparation, quality control, construction layout, road construction (base and final layers), utility installation (HDPE gravity lines, force mains, culverts), ditching, valve vaults, revegetation, fencing, electrical work, and delivery of a 30 × 40 pole building. All work is to be performed on‑site and billed on a lump‑sum or unit‑price basis as detailed in the line‑item schedule.
• Mobilization & demobilization, site prep, QC, layout – lump‑sum items.
• Earthwork (EQ Basin) – 35,000 cy of fill/removal.
• Road construction – 700 lf each of base and final layers, plus maintenance.
• HDPE pipelines – 12 in gravity line, 10/8/4 in force mains, 6 in sludge main, 18 in dual‑wall culvert.
• Valves, vaults, and associated hardware.
• Ditching, silt fence, revegetation (5 ac), farm fencing, electrical, and a pole building.
• All materials, labor, and related services must comply with WV environmental reclamation standards.