The City of Seattle is seeking bids for the FS 31 Interim Decommissioning Project, which involves the demolition of temporary site and building improvements associated with an interim fire station and restoration of the site to its previous use as a fenced gravel parking lot with a small play area. The project includes demolition and removal of two tensile fabric tents, concrete tent foundations, support systems, fencing, utilities, paving, and storm drainage components, as well as site restoration, grading, gravel surfacing, fencing, play area with engineered wood fiber, concrete paving, and extensions to the storm drainage system. The engineer's estimate for the base bid is $921,198.00, and the estimate for Alternate (Additive) No. 1, which involves the demolition and disposal of modular buildings, is $164,231.00. The project requires coordination with the owner's separate contractor for modular building removal and compliance with applicable codes and regulations.
Some key features of the project include:
* Demolition and removal of temporary site and building improvements
* Restoration of the site to its previous use as a fenced gravel parking lot with a small play area
* Compliance with applicable codes and regulations, including the Seattle Building Code, Seattle Mechanical Code, Seattle Electrical Code, Seattle Fire Code, and Seattle Energy Code
* Coordination with the owner's separate contractor for modular building removal
* Protection of existing utilities and improvements to remain
* Repair of damage and disposal of materials per contract documents
* Maintenance of temporary erosion and sediment control measures
* Installation of inlet protection in existing catch basins and new catch basins
* Compliance with City of Seattle standards for construction stormwater control and post-construction soil management