Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Illinois guideIllinois Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Illinois
  4. ›Closed bids
  5. ›Prentiss Creek Streambank Stabilization Design/Build

Village of Downers Grove·Illinois

Prentiss Creek Streambank Stabilization Design/Build

Closes 8/26/2026$1M – $3MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Village of Downers Grove is seeking a design‑build contractor to stabilize the streambank of Prentiss Creek between 67th Street and Prentiss Drive, improve water quality, and secure necessary permits. The effort includes full engineering design, construction of stabilization measures, and coordination with regulatory agencies. The project will be performed on a property owned by the Village that runs behind residential homes. • Scope includes design, permitting, and construction of streambank stabilization structures. • Required services: civil, structural, environmental, and construction management engineering. • Deliverables: detailed design drawings, construction plans, and as‑built documentation, plus compliance reports for state and federal water quality standards.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Julie Lomax(Stormwater Administrator)

[email protected]

(630) 493-8821

Key dates

Opened
8/6/2026
Closes
8/26/2026

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
237990
Solicitation №
RFP-SW-091-0-2026/JL

Budget estimate

$1,000,000 – $3,000,000

No explicit budget is listed, but streambank stabilization design‑build projects of this scale typically range from $1 million to $3 million depending on site conditions, design complexity, and construction length. Given the need for full engineering, permitting, and construction on a residential‑adjacent corridor, a realistic estimate falls within the $1‑3 M window.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Anderson·South Carolina

Top match · 76%

Branchcliff Lane Streambank Stabilization

Closes 11/2/2026Opened 10/12/2026

U.S. Department Of Defense·Texas

72% match

Mary Rhodes Pump Station: Emergency Streambank Erosion Protection

Closes 10/13/2026Opened 10/1/2026

James City County·Virginia

71% match

Landing Circle Stream Restoration

Closes 10/28/2026Opened 9/23/2026

City of Austin·Texas

69% match

Williamson Creek - Tributary 4 Channel Stabilization

Rolling / TBD closeOpened 9/28/2026

James City County·Virginia

69% match

Landing Circle Stream Restoration

Closes 10/21/2026Opened 9/23/2026

Sustainable Woodstock·Vermont

68% match

Barnard Brook at Woodstock Garden Bank Stabilization

Closes 10/20/2026Opened 9/17/2026

U.S. Department Of Defense·Texas

68% match

Mary Rhodes Pump Station: Emergency Streambank Erosion Protection

Closes 10/13/2026Opened 10/1/2026

City of Dubuque·Iowa

68% match

North Fork Catfish Creek Multi-Site Design Services

Closes 11/6/2026Opened 10/9/2026

Laramie Rivers Conservation District·Wyoming

68% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

Maryland Charles County Government·Maryland

68% match

ITB 27-009 NPDES Oak Ridge Park East Stream Restoration

Closes 10/20/2026Opened 9/18/2026

California Grants·California

67% match

Stream Flow Enhancement

Rolling / TBD closeOpened 6/6/2025

U.S. Department Of The Interior·Colorado

67% match

Y--Pre-Proposal Site Visit

Closes 5/27/2027Opened 5/28/2026

Trout Unlimited·Wyoming

67% match

South Fork Ditch Creek Fish Passage Project

Closes 10/30/2026Opened 10/9/2026

City of Charlotte·North Carolina

67% match

Newell Stream Restoration Project

Rolling / TBD closeOpened 7/15/2026

Martin County Purchasing·Florida

67% match

Bessey Creek Retrofit – Design

Closes 10/28/2026Opened 9/30/2026

Maryland City of Gaithersburg·Maryland

67% match

Construction Services for Rabbitt Road Stream & Vegetative Buffer Restoration

Closes 10/28/2026Opened 9/18/2026

City of Colorado Springs·Colorado

67% match

Cottonwood Creek Stabilization Academy to Union

Closes 11/9/2026Opened 10/9/2026

Catawba Regional Council of Governments·South Carolina

67% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

California Department of Transportation·California

66% match

Construct multi-use path, drainage, and rectangular rapid FB system.

Closes 10/22/2026Opened 9/14/2026

Ohio University·Ohio

66% match

OUL Fetters Run Erosion Control Improvements Phase 1

Closes 10/13/2026Opened 9/16/2026

Charles County Government·Maryland

66% match

NPDES Oak Ridge Park East Stream Restoration

Closes 10/20/2026Opened 9/14/2026

California Grants·California

66% match

Urban Streams Restoration Program

Rolling / TBD closeOpened 10/1/2026

North Carolina County of Mecklenburg·North Carolina

66% match

Kings Branch at Arrowood Road Phase 2B Stream Restoration

Closes 11/5/2026Opened 10/9/2026

Sedgwick County·Kansas

66% match

801-C-4200; N 151st St W Bridge Over Eagle Drainage Ditch

Closes 10/27/2026Opened 10/27/2026

City of Charlotte·North Carolina

66% match

Bruns Academy Water Quality Enhancement Project

Rolling / TBD closeOpened 2/15/2027