Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Connecticut
  4. ›Closed bids
  5. ›South Cannon Street Realignment

City of Searford·Connecticut

South Cannon Street Realignment

Closes 9/2/2026
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Seaford, Delaware is soliciting bids for the South Cannon Street Realignment project. The project involves: 1. Removing an existing 600 sq ft concrete pad 2. Stripping topsoil for the roadway and placing 8" of CR-6 fill 3. Grading the existing roadway with topsoil 4. Seeding and matting disturbed areas 5. Relocating a fence to the new roadway 6. Installing two bollards Bids must be submitted in a sealed envelope by 2:30 pm on September 2, 2026, to the City Manager's office. The bid must include all materials, labor, and equipment necessary for the project. The city reserves the right to reject any bid and may award the contract to the lowest responsible bidder. The project must be completed within 60 calendar days from the projected award date of September 9, 2026, and no work will take place on Sundays. The contractor will be charged liquidated damages of $100 per day if the work extends past the 60-day period. The bid must include the following items: * Remove existing concrete pad (600 sq ft) * Strip topsoil for roadway and place 8" of CR-6 fill (2,400 sq ft) * Grade existing roadway with topsoil (2,400 sq ft) * Seed and matt disturbed areas (1 lot) * Relocate fence to new roadway (1 lot) * Install two bollards (1 lot) The bid must also include the total bid amount and the unit prices for each item. The city requires the contractor to provide proof of insurance, including comprehensive liability, bodily injury, and property damage, and workers' compensation insurance. The contractor must also provide a written certificate with each progress payment request stating that they have paid their labor, vendors, suppliers, and subcontractors in full. The city will review the bids and award the contract to the qualified contractor who presents the proposal with the lowest cost that fully meets the specifications. Experience will also be a factor in considering the award of the contract.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
7/22/2026
Closes
9/2/2026

Last updated

Details

Industry
Civil Engineering
NAICS
237310

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Shawnee·Kansas

Top match · 59%

Ordinance No. 3517

Closes 3/5/2030Opened 3/4/2025

City of Shawnee·Kansas

58% match

Ordinance No. 3510

Closes 2/5/2027Opened 11/5/2024

City of Shawnee·Kansas

58% match

Ordinance No. 3514

Closes 1/13/2032Opened 1/13/2025

City of Indianapolis·Indiana

58% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/9/2026

City of Shawnee·Kansas

57% match

Ordinance No. 3509

Closes 10/22/2030Opened 10/22/2024

City of Princeton·New Jersey

57% match

Demolition and Site Restoration Services at 915 Mount Lucas Road & 725 Herrontown Road, Princeton

Closes 10/14/2026Opened 9/16/2026

City of Indianapolis·Indiana

56% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/8/2026

Idaho Transportation Department·Idaho

56% match

Key No. 23880 SPIRIT LAKE CUTOFF CURVES

Closes 10/27/2026Opened 10/6/2026

City of Shawnee·Kansas

56% match

Ordinance No. 3499

Closes 8/20/2029Opened 8/20/2024

City of Shawnee·Kansas

56% match

Ordinance No. 3492

Closes 7/17/2030Opened 7/16/2024

City of Shawnee·Kansas

56% match

Ordinance No. 3489

Closes 6/4/2029Opened 6/4/2024

City of Indianapolis·Indiana

56% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/8/2026

South Texas College·Texas

55% match

Pecan Plaza East Building B Renovations

Closes 10/22/2026Opened 10/7/2026

City of Charlotte·North Carolina

55% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

City of Grand Island·Nebraska

55% match

Sycamore Street- 10th Street to Capital Avenue Rehabilitation; Project No. 2026-P-3 (27-012)

Closes 10/14/2026Opened 9/22/2026

City of Columbus·Ohio

55% match

Mobility - 4th Street - Livingston Avenue to Chestnut Street

Closes 10/21/2026Opened 9/22/2026

City of Shawnee·Kansas

55% match

Ordinance No. 3508

Closes 10/22/2030Opened 10/22/2024

City of Hastings·Nebraska

55% match

E Street Resurfacing - Burlington Ave to Pine Ave CH 2026-57

Rolling / TBD closeOpened 9/18/2026

City of Austin·Texas

55% match

South Lamar Blvd Corridor: US 290 to Montclaire St.

Rolling / TBD closeOpened 7/6/2026

City of Newberg·Oregon

54% match

River Street Rebuild 2027

Closes 11/9/2026Opened 10/12/2026

City of Kirkwood·Missouri

54% match

Construction Services for South Clay Avenue Resurfacing - STP 5502(614)

Closes 10/13/2026Opened 9/15/2026

Henrico County Government·Virginia

54% match

ITB No. 26-3001-9JOK - Shady Grove Road & Old Nuckols Road Safety & Mobility Improvements

Closes 10/14/2026Opened 9/18/2026

City of Shawnee·Kansas

54% match

Ordinance No. 3490

Closes 6/4/2030Opened 6/4/2024

City of Charlotte·North Carolina

54% match

Sharon Road at Eastburn Road Improvements

Rolling / TBD closeOpened 1/2/2026

City of San Antonio·Texas

54% match

23-03900 Hays Street Bridge Connections & Eastside Area Streets (2022 Bond)

Closes 10/30/2026Opened 9/30/2026