Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More architecture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Washington
  4. ›Closed bids
  5. ›Klickitat State Park-Suburbia Bridge

Washington Parks & Recreation Commission, State·Washington

Klickitat State Park-Suburbia Bridge

Closes 8/18/2026$150k – $500kRequest for QualificationLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The State Parks and Recreation Commission is seeking a qualified consultant team to develop full construction‑document sets for a new suspension bridge (the Suburbia Bridge) that will close a gap in the Klickitat State Park Trail. The effort includes advancing the design from 60 % to 100 % bid‑ready documents, supporting permitting, assisting with the bidding process, and providing construction‑administration services. The project is budgeted at approximately $4 million for construction, with the design‑consultant fee expected to be a percentage of that amount. • Scope – Prepare 95 % and 100 % construction drawings, specifications, cost estimates, and GIS data; obtain necessary environmental and shoreline permits; manage pre‑bid conference and bid evaluation. • Schedule – Pre‑bid conference July 29 2026; questions due July 15 2026; final submission August 18 2026; anticipated design‑document completion by March 2027; construction to finish by December 2028. • Requirements – WA professional engineering license; ≥5 years suspension‑bridge experience; registration in WEBS; MWBE inclusion plan; insurance coverage per state standards.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Danielle Ansell(Procurement Coordinator)

[email protected]

(360) 902-8528

Key dates

Opened
7/2/2026
Questions due
7/15/2026
Pre-bid meeting
7/29/2026
Closes
8/18/2026
Duration
2 years

Last updated

Details

Type
Request for Qualification
Industry
Architecture
NAICS
541310
Solicitation №
RFQ 527-332

Budget estimate

$150,000 – $500,000

The design‑consultant fee is typically 5‑10 % of the construction budget for a complex suspension bridge. With a maximum allowable construction cost of roughly $4 million, the consulting fee is estimated between $200,000 and $400,000; allowing for lower‑end firms or reduced scope, a range of $150,000‑$500,000 is reasonable. Factors influencing the final amount include the firm’s experience level, the extent of MWBE subcontracting, and any additional permitting or construction‑admin services added after the initial award.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of The Interior·Colorado

Top match · 66%

YELL 338223 - Bridge Preservation

Closes 10/30/2026Opened 4/24/2026

U.S. Department Of Transportation·Washington

64% match

WY NP YELL 15(2), Madison River Bridge

Closes 7/1/2028Opened 7/2/2026

City of Fort Myers·Florida

64% match

John Yarbrough Linear Park (JYLP) Trail Construction from Colonial Blvd. to Hanson St. Rebid (Sun Trail 447515-1-54-01)

Closes 11/9/2026Opened 10/7/2026

U.S. Department Of The Interior·Wyoming

63% match

Z--YELL 338223 - Bridge Preservation

Closes 10/30/2026Opened 10/7/2026

City of Kearney·Missouri

63% match

Mack Porter Park Connector Shared Use Path - Kearney, MO

Closes 11/3/2026Opened 10/6/2026

Alaska Department of Transportation and Public Facilities (DOT&PF)·Alaska

63% match

DOT&PF Notice of Public Open House: Klondike Highway Rehabilitation: Skagway River Bridge to Black Lake

Rolling / TBD closeOpened 9/15/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

63% match

Rehabilitation, Preservation, and Operation of Schoellkopf Hall at DeVeaux Woods State Park

Closes 10/14/2026Opened 7/23/2026

Pierce County·Washington

63% match

Orangegate Park Phase 1 Site Improvements

Closes 11/4/2026Opened 10/7/2026

City of Frontenac·Missouri

63% match

STP-5503(609) - Spoede Road Bridge Replacement

Closes 11/2/2026Opened 9/15/2026

City of Springfield, MO - Division of Purchases·Missouri

63% match

IFB 013-2027 Lost Hill Park Greenway Trail Bridge

Closes 10/13/2026Opened 9/8/2026

Missouri Department of Transportation·Missouri

63% match

STL District, University City, removal of the bridge on Kempland Place crossing River Des Peres

Closes 10/20/2026Opened 9/15/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

63% match

Tree Removal - James Baird State Park

Closes 10/26/2026Opened 10/2/2026

Louisiana Recreation and Park Commission for the Parish of East Baton Rouge·Louisiana

63% match

Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 10/27/2026Opened 9/30/2026

Missoula County·Montana

62% match

Lolo Street Bridge Replacement Bid Set with Bridge Plans & Water Main Plans IFB, Geotechnical Report, Beau Geste Addition Lot 1 TCE, Orrsdale No. 3 Lots 1 $ 3 Slope Easement, 318 Permit Authorization

Closes 10/14/2026Opened 9/17/2026

Missouri Office of Administration·Missouri

62% match

Water Supply System - Bryant Creek State Park

Closes 10/22/2026Opened 10/8/2026

New York City Department of Transportation·New York

62% match

84127P0001-TD/CSS for Crocheron Park Pedestrian Bridge Over BCIP, Borough of Queens

Closes 11/6/2026Opened 9/28/2026

Massachusetts Department of Conservation and Recreation·Massachusetts

62% match

DCR 993 Temporary Steel Bridges

Closes 11/25/2026Opened 9/28/2026

Alaska Department of Transportation and Public Facilities·Alaska

62% match

NOTICE OF FLOOD ENCROACHMENT & INTENT TO BEGIN ENGINEERING AND ENVIRONMENTAL STUDIES: Moose Creek Bridge and Moose Creek

Closes 10/23/2026Opened 9/24/2026

Mendocino County·California

62% match

Hill Road Bridge Replacement over Mill Creek, CR 327B at M.P. 2.05

Closes 10/22/2026Opened 8/13/2026

City of Green Bay·Wisconsin

62% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Connecticut Energy & Environmental Protection·Connecticut

62% match

Connecticut Partnerships in Parks Initiative Notice of Request for Information

Closes 11/22/2026Opened 8/20/2025

U.S. Department Of Transportation·Washington

62% match

ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1

Closes 8/20/2028Opened 8/20/2026

City of St. Louis Board of Public Service·Missouri

62% match

Union Lindell Bridge Replacement

Closes 10/20/2026Opened 9/16/2026

City of Columbia·Missouri

62% match

Replacement of Bridge 9 on MKT Trail

Closes 10/20/2026Opened 9/29/2026

County of Chester·Pennsylvania

62% match

Struble Trail Extension to Marsh Creek State Park

Closes 11/4/2026Opened 9/25/2026