The contract is for the construction of Miller Rd., a 1.5-mile road project. The scope of work includes blading and shaping the roadway, pit run surfacing, and installing culverts. The contract was awarded to Hartley Construction for a total of $118,191.25. The project is expected to start within 7 days of the award and be completed by October 18, 2024.
• The project involves blading and shaping a 20-foot wide roadway for 1.5 miles.
• The project includes pit run surfacing, with a total of 2904 cubic yards of material.
• The project requires the installation of six 30-foot culverts.
• The contractor must comply with certain conditions, including obtaining liability insurance and performance and payment bonds.