This contract awards the City of Auburn a modest‑scale municipal drainage improvement at 95 Main Street. The work includes excavation, installation of a 15‑inch HDPE culvert, a new Type A5‑C catch basin, pavement removal, milling, and resurfacing with hot‑mix asphalt, as well as brick sidewalk reconstruction, granite curb reset, and full traffic‑control management. The project budget is $83 K, and the contractor must complete all work within roughly five weeks, with post‑completion trench inspections scheduled for the following year. The award is a firm‑fixed‑price, single‑vendor contract that follows a competitive open‑bidding process.
• Scope: drainage conduit, catch‑basin, pavement demolition/milling, HMA resurfacing, brick sidewalk, curb work, and traffic‑control.
• Schedule: work window Oct 13 – Nov 21 2025 (≈40 days); trench inspection in 2026.
• Financials: contract value $83,000; 10 % retainage, bid bond required, performance bond required for contracts >$99,999 (not applicable here).