Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • South Carolina guideSouth Carolina Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More architecture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›South Carolina
  4. ›Closed bids
  5. ›Central Kitchen Feasibility Study and (optional) Design

Awarded contract·Richland County School District One·South Carolina

Central Kitchen Feasibility Study and (optional) Design

$350kAwarded 9/24/2026Single Award
Contract source

Description

This contract concerns a feasibility study—and optionally subsequent design services—for a Central Kitchen that would serve multiple schools in the Richland County School District One. The work will analyze cost, logistics, operational models, and potential savings, and, if the district opts to move forward, will produce detailed design plans for the proposed facility. • Scope: Feasibility analysis of a district‑wide central kitchen, followed by optional architectural/engineering design. • Timeline: Bid opening on July 7 2026; award intent posted September 15 2026; effective award date September 24 2026. Work may not begin until a purchase order is issued after that date. • Procurement: Full and open competition via RFP 2026‑018; intent‑to‑award issued under the district’s procurement code.

Attached files

Key dates

Bids closed
7/7/2026
Intent to award
9/24/2026
Awarded
9/24/2026
Contract modified
7/6/2026
Starts
9/24/2026
Ends
9/15/2027
Duration
12 months

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Architecture
NAICS
541310
Solicitation №
RFP 2026-018

Contract value

$350,000

No explicit contract value is disclosed. A feasibility study for a district‑wide central kitchen typically ranges from $150,000 to $500,000, depending on scope depth, data requirements, and optional design complexity. Considering the need for both a detailed feasibility report and the possibility of full architectural design, a mid‑range estimate of roughly $350,000 is reasonable. Factors influencing this estimate include: (1) the size of the school district and number of facilities to be served, (2) the complexity of kitchen equipment integration, (3) local construction cost indices in South Carolina, and (4) the optional nature of the design phase, which can significantly increase costs if pursued.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Oregon NW Senior & Disability Services·Oregon

Top match · 76%

Kitchen Feasibility Study

Closes 10/16/2026Opened 9/15/2026

El Paso County·Texas

66% match

El Paso County Ysleta Annex Community Kitchen

Closes 11/5/2026Opened 8/17/2026

El Paso County·Texas

65% match

El Paso County Ysleta Annex Community Kitchen

Closes 10/15/2026Opened 8/17/2026

North Carolina East Carolina University·North Carolina

64% match

East Carolina University

Closes 10/30/2026Opened 10/6/2026

Pennsylvania State University-Main Campus·Pennsylvania

64% match

UP - Pollock Commons Study

Closes 10/28/2026Opened 8/28/2026

El Paso County·Texas

64% match

El Paso County Ysleta Annex Community Kitchen

Closes 11/5/2026Opened 8/17/2026

The University of North Carolina·North Carolina

64% match

Interior Improvements - Talley Student Union

Closes 10/19/2026Opened 12/6/2023

Massachusetts Mansfield Housing Authority·Massachusetts

63% match

Kitchen Replacement

Closes 10/13/2026Opened 9/8/2026

State of Missouri Office of Administration·Missouri

63% match

Renovate Kitchen Food Service Building - Moberly Correctional Center

Closes 11/10/2026Opened 10/23/2026

Samaritan House of Orangeburg·South Carolina

63% match

Samaritan House Cafeteria & Multipurpose Building

Closes 10/20/2026Opened 9/18/2026

U.S. National Institutes of Health·United States of America

63% match

Feasibility Studies to Inform the Design of Future Clinical Trials

Closes 2/15/2027Opened 4/28/2026

City of Fairfax·Virginia

63% match

Concept Feasibility Study, Fairfax Circle

Closes 11/12/2026Opened 10/9/2026

City of Bellevue·Washington

62% match

Crossroads Community Center Teaching Kitchen and Teen Room Renovation

Closes 10/22/2026Opened 9/24/2026

Connecticut YWCA Hartford Region·Connecticut

62% match

The Center for Community Engagement and Impact at YWCA Hartford Region

Closes 10/14/2026Opened 9/15/2026

North Carolina NC State University·North Carolina

62% match

NC State University

Closes 10/19/2026Opened 9/23/2026

Georgia City of Smyrna·Georgia

62% match

Community Center Kitchen Renovation

Closes 10/15/2026Opened 9/21/2026

Mansfield Housing Authority·Massachusetts

61% match

Kitchen Replacement

Closes 10/13/2026Opened 9/4/2026

Connecticut Town of Windsor·Connecticut

61% match

Multidisciplinary Predevelopment Feasibility Study

Closes 10/30/2026Opened 10/9/2026

U.S. Department Of Energy·Illinois

60% match

Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

Closes 11/17/2026Opened 10/6/2026

Michigan Yale Public Schools·Michigan

60% match

Kitchen equipment

Closes 10/15/2026Opened 9/11/2026

Hennepin County·Minnesota

60% match

Franklin Library Planning Study

Closes 10/26/2026Opened 9/24/2026

Rockford Park District·Illinois

60% match

Design Build - Carlson Arctic Ice Arena

Closes 10/28/2026Opened 10/7/2026

U.S. National Institutes of Health·United States of America

60% match

Silvio O. Conte Digestive Diseases Research Core Centers (P30-Clinical Trial Optional)

Closes 2/10/2027Opened 9/2/2025

Maryland City of Rockville·Maryland

60% match

RFP 04-27 King Farm Farmstead Master Plan Phase 1 for Design Services

Closes 12/1/2026Opened 10/7/2026

Northeastern Illinois University·Illinois

60% match

Invitation for Construction Bid: Integrated Bioprocessing Research Laboratory Add

Closes 11/4/2026Opened 10/1/2026