Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New Jersey guideNew Jersey Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›New Jersey
  4. ›Closed bids
  5. ›Contract No. P200.808 Shoulder Erosion Improvements, Milepost 154 t…

Awarded contract·New Jersey Turnpike Authority (NJTA)·New Jersey

Contract No. P200.808 Shoulder Erosion Improvements, Milepost 154 to 156

$1.5MSingle Award
Contract source

Description

This solicitation concerns a highway‑maintenance contract for “Shoulder Erosion Improvements” on the New Jersey Turnpike between milepost 154 and milepost 156. The work is expected to address erosion of the road shoulder, likely involving removal of degraded material, installation of stabilization measures (e.g., rip‑rap, geotextiles, vegetation), and reconstruction of the shoulder surface to restore safety and drainage. • Scope: erosion control and shoulder reconstruction on a ~2‑mile stretch of the Turnpike. • Likely deliverables: site assessment, removal of compromised material, installation of erosion‑control structures, and resurfacing. • Project context: part of ongoing roadway preservation efforts to maintain structural integrity and safety of the Turnpike corridor.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
8/21/2025

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Civil Engineering
NAICS
237990
Solicitation №
Contract No. P200.808

Contract value

$1,500,000

The document provides no dollar amount. Typical shoulder‑erosion repair on a limited mileage (≈2 mi) can range widely based on site conditions, material, and design complexity. Assuming moderate erosion that requires removal of existing material, installation of rip‑rap or geotextile stabilization, and resurfacing, a rough industry benchmark is roughly $500 k–$1 M per mile for similar highway projects. Multiplying by the ~2‑mile scope gives an estimated contract value of $1 M to $2 M. Taking a midpoint for a conservative ballpark, the contract is likely valued around **$1.5 million**. Factors influencing the final price would include: soil conditions, accessibility, required permitting, material prices, and any ancillary utility work.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Division of Highways·North Carolina

Top match · 74%

Milling, Resurfacing, and Shoulder Reconstruction – Division 14

Closes 10/27/2026Opened 10/5/2026

Illinois Tollway·Illinois

73% match

I-26-2064 - Asphalt Overlay & Pavement Marking

Closes 11/13/2026Opened 10/3/2026

New Jersey Turnpike Authority (Njta)·New Jersey

72% match

Contract No. P200.831 Guide Rail Improvements, Milepost 160.0 to 172.4

Closes 10/19/2026Opened 9/23/2026

Illinois Tollway·Illinois

72% match

I-26-2059 - Plaza Improvements

Closes 11/13/2026Opened 10/3/2026

Texas Department of Transportation·Texas

71% match

STATE LET CONSTRUCTION CONTRACT, HUNT CO, WIDEN ROAD - ADD SHOULDERS

Closes 11/4/2026Opened 10/7/2026

Oregon Clackamas County·Oregon

71% match

BID 2026-65 Bear Creek Culvert and Molalla Ave Shoulders Project

Closes 10/14/2026Opened 9/22/2026

Georgia City of Grayson·Georgia

71% match

2026 Grayson Road Resurfacing Program II: Contract # 27-01

Closes 10/14/2026Opened 9/9/2026

Coastal Carolina University·South Carolina

71% match

Highway 544 Pedestrian Safety Pathway Expansion

Closes 10/15/2026Opened 9/30/2026

U.S. Department Of Transportation·Washington

70% match

ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements

Closes 8/12/2028Opened 8/12/2026

CPPJ Road, Bridge, & Utility·Louisiana

70% match

Pavement Preservation in Calcasieu Parish – Project No. 26‑105‑1234

Closes 10/21/2026Opened 9/24/2026

Tarrant Regional Water District·Texas

70% match

Eagle Mountain Spillway Guardrail Height Adjustment

Closes 10/20/2026Opened 9/23/2026

U.S. Virgin Islands GVIBUY·U.S. Virgin Islands

70% match

Spring Gut Road Bridge Replacement

Closes 10/14/2026Opened 8/24/2026

Georgia City of Covington·Georgia

70% match

2026-21 Newton Drive Storm Drainage Improvements Project

Closes 10/13/2026Opened 8/24/2026

Illinois THA - Toll Highway Authority·Illinois

70% match

I-21-4743 - EWO#67 Offsetting CO #77 - ATP #119 - I-490 Roadway and Bridge Construction

Closes 10/29/2026Opened 10/7/2026

City of Lincoln·Nebraska

70% match

Lincoln Parks and Recreation Highlands and Holmes Golf Course Pavement Improvements

Closes 10/16/2026Opened 9/25/2026

City of Lincoln·Nebraska

70% match

Lincoln Parks and Recreation Highlands and Holmes Golf Course Pavement Improvements

Closes 10/16/2026Opened 9/25/2026

South Carolina Forestry Comm·South Carolina

70% match

Road Reconditioning- Sumter National

Closes 10/27/2026Opened 9/30/2026

Virginia Department of Transportation·Virginia

70% match

A71_2026 MEDIAN, GUARDRAIL, AND PIER PROTECTION IMPROVEMENTS

Closes 10/28/2026Opened 9/9/2026

North Texas Tollway Authority·Texas

70% match

RFB 06493 PGBT Restriping from IH-20 to SH-183 and from N Belt Line Rd to IH-35

Closes 10/22/2026Opened 9/18/2026

U.S. Department Of Transportation·Washington

70% match

WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4

Closes 11/4/2026Opened 9/30/2026

Massachusetts City of Gardner·Massachusetts

70% match

2027-014 Landfill Erosion Controls

Closes 10/21/2026Opened 9/30/2026

North Texas Tollway Authority·Texas

70% match

RFB 06494 - 2027 Raised Pavement Marker (RPM) Replacement

Closes 10/22/2026Opened 9/18/2026

Texas Department of Transportation·Texas

70% match

LOCAL LET MAINTENANCE CONTRACT, WASHINGTON CO, LIMESTONE ROCK ASPHALT

Closes 10/13/2026Opened 9/16/2026

Mississippi

70% match

Erosion Control Measures on New Zion Road – Emergency Watershed Protection

Closes 10/19/2026Opened 10/1/2026

Texas Department of Transportation·Texas

70% match

LOCAL LET MAINTENANCE CONTRACT, GRAYSON CO, DEBRIS REMOVAL

Closes 10/15/2026Opened 9/22/2026