This solicitation concerns a highway‑maintenance contract for “Shoulder Erosion Improvements” on the New Jersey Turnpike between milepost 154 and milepost 156. The work is expected to address erosion of the road shoulder, likely involving removal of degraded material, installation of stabilization measures (e.g., rip‑rap, geotextiles, vegetation), and reconstruction of the shoulder surface to restore safety and drainage.
• Scope: erosion control and shoulder reconstruction on a ~2‑mile stretch of the Turnpike.
• Likely deliverables: site assessment, removal of compromised material, installation of erosion‑control structures, and resurfacing.
• Project context: part of ongoing roadway preservation efforts to maintain structural integrity and safety of the Turnpike corridor.
Attached files
The award documents live at the source — open the contract source above to download them.