The Tarrant Regional Water District (TRWD) is soliciting qualified contractors to adjust the existing metal‑beam guardrail along the Eagle Mountain spillway roadway to a uniform height of 28 inches, preserving serviceable components and ensuring compliance with TxDOT standards. The work covers approximately 6,200 linear feet of guardrail, requiring field verification, rail raising, post adjustments or replacements, hardware replacement, traffic control, and final inspection. Bidders must attend a mandatory pre‑proposal meeting on October 8, 2026, submit questions by October 14, 2026, and deliver a lump‑sum proposal by October 20, 2026. The contract award is expected November 17, 2026.
• Adjust existing guardrail to 28‑inch height, retaining usable posts and rails.
• Perform pre‑construction inspection, document existing conditions, and identify needed replacements.
• Provide all labor, equipment, traffic control, and materials (galvanized where required).
• Submit a single PDF proposal with price, project approach, references, timeline, and required forms (bid bond, insurance, etc.).
• Mandatory pre‑proposal meeting on 10/8/2026; questions due 10/14/2026; proposal due 10/20/2026.
• Estimated quantity: ~6,200 linear feet; pricing per linear foot plus separate unit items for replacement components.
• Evaluation based on price (40%), approach (30%), references (20%), and timeline (10%).