The Metropolitan District is awarding a contract for the complete replacement of Centrifuge No. 2 at its Hartford Water Pollution Control Facility. The scope includes removal of the existing centrifuge, installation of a new centrifuge and associated sludge‑cake conveyor, replacement of extensive piping (sludge feed, centrate, flushing water, polymer, vent), structural steel platform modifications, new de‑watering room flooring, upgraded controls, and related electrical improvements. Bidders must hold a current DAS Contractor Pre‑Qualification Certificate for water‑treatment plants, provide a 10 % bid security, and attend a mandatory pre‑bid conference and site tour on 10 / 3 / 2023. The bid documents are available only through the designated ProcureWare website, and all official communications are handled via that portal.
• Replacement of a major centrifuge and associated mechanical, electrical, and civil work at a municipal water‑treatment plant.
• Mandatory pre‑bid conference and site tour with strict PPE requirements.
• Requires DAS pre‑qualification and a 10 % bid security; full bid opening scheduled for 10 / 31 / 2023.
Attached files
The award documents live at the source — open the contract source above to download them.