The City of Boise is soliciting bids for the excavation and disposal of approximately 7,447 tons of contaminated soil. The project includes the removal of the settled floc from a 1.89-acre portion of a 3.4-acre storage area. The successful bidder will be required to provide mobilization, excavation and disposal, fence removal and replacement, SWPPP installation, inspection, and maintenance, construction entrance and street cleaning, haul road stabilization, and revegetation of disturbed areas. The contract will be awarded to the bidder that provides the best value to the City.
• The project requires the excavation and disposal of contaminated soil.
• The project includes the removal of settled floc from a 1.89-acre portion of a 3.4-acre storage area.
• The successful bidder will be required to provide various services, including mobilization, excavation and disposal, and revegetation of disturbed areas.
• The contract will be awarded to the bidder that provides the best value to the City.
• The City of Boise is an Equal Opportunity Employer.
• The City reserves the right to reject any and all bids.