The Alaska Energy Authority contracted HDR Alaska, Inc. to provide comprehensive engineering services for the Fivemile Creek hydroelectric project. The scope covers final design (65 %, 95 % and full PS&E), permitting (including NEPA analysis), and continuous hydrology data collection to support construction. The contract is for a two‑year period with an optional two‑year renewal and was awarded through a full and open sealed‑bid competition.
• Deliver 65 % design by April 2021, 95 % thereafter, and final design by mid‑2021.
• Conduct hydrology monitoring, develop rating curves, and submit annual hydrology reports.
• Prepare all required permits, complete NEPA analysis, and coordinate with the CMGC and other agencies.