Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Hawaii guideHawaii Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Hawaii
  4. ›Closed bids
  5. ›RFP No. P-0001, Design-Build Construction, Job No. 24-05, WK-39, Ka…

Awarded contract·Department of Water, County of Kauai·Hawaii

RFP No. P-0001, Design-Build Construction, Job No. 24-05, WK-39, Kapaa Homesteads Well No. 4 Pump and Controls, Kapaa, Kauai, Hawaii

Won by Hawaiian Dredging Construction Company, Inc.$7.7MSingle Award
Contract source

Awarded vendors

  • Hawaiian Dredging Construction Company, Inc.

Description

The contract is for the design-build construction of a potable drinking water well and associated facilities, infrastructure, and appurtenances, including a supervisory control and data acquisition (SCADA) system, for the Puhi-Līhu'e-Kapa‘a Water System. The project involves developing construction documents, performing environmental review, obtaining necessary permits, and constructing a fully operational potable drinking water well. The contract was awarded to Hawaiian Dredging Construction Company, Inc. for $7,683,000.00. • The project is located at Tax Map Key (TMK): (4)4-6-011-003. • The contract was posted on May 15, 2024. • The proposal was due on February 16, 2024. • The contract is for the Department of Water, County of Kauai. • The point-of-contact person is Christine Erorita.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Other Than Full and Open Competition
Industry
Civil Engineering
NAICS
237110
Solicitation №
RFP No. P-0001, Part 1

Contract value

$7,683,000

The contract value is explicitly stated as $7,683,000.00. This amount is likely based on the scope of work, which includes the design-build construction of a potable drinking water well and associated facilities. The value may have been influenced by factors such as labor costs, material costs, and the complexity of the project.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Hawaii Agribusiness Development Corporation·Hawaii

Top match · 75%

Interim Operation of Kawaiele Pump Station, Kekaha, Kauai

Closes 10/29/2026Opened 10/5/2026

County of Maui·Hawaii

74% match

Kihei 4 and 5 WWPS Modifications

Closes 11/2/2026Opened 10/2/2026

County of Maui·Hawaii

74% match

Waiehu Kou WWPS Modifications

Closes 10/14/2026Opened 9/10/2026

State of Hawaii Department of Transportation – Harbors Division·Hawaii

73% match

P10904 Domestic & Fire Waterline Systems Replacement Pier 51A

Closes 12/3/2026Opened 10/8/2026

State of Hawaii Department of Transportation·Hawaii

73% match

STP-0700(098), INTELLIGENT TRANSPORTATION SYSTEMS KAUAI, PART 1

Closes 10/26/2026Opened 9/15/2026

Hawaii Department of Business, Economic Development and Tourism·Hawaii

72% match

Villages of Kapolei Groundwater Monitoring Services

Closes 11/2/2026Opened 10/1/2026

County of Maui·Hawaii

72% match

Groundwater Deep Monitoring Well at Alaeloa Tank Site [Tk104]

Closes 11/13/2026Opened 10/5/2026

State of Hawaii Department of Transportation – Highways Division·Hawaii

72% match

NH-072-1(057) Kal Hwy Resurfacing Makai Pier to Hanauma Bay Rd

Closes 10/29/2026Opened 8/18/2026

U.S. Department Of Defense·Hawaii

71% match

Relocate Schofield Barracks Deep Wells Above Ground, Building 1580, Schofield Barracks, Oahu, Hawaii

Closes 4/21/2027Opened 4/20/2026

State of Hawaii Department of Transportation – Airports·Hawaii

71% match

CM1530-33 Apron Reconstruction, Phase 1, Kahului airport

Closes 11/16/2026Opened 10/2/2026

County of Maui·Hawaii

71% match

Kihei Fire Station Roof Replacement

Closes 11/4/2026Opened 10/6/2026

Hawaii Agribusiness Development Corporation·Hawaii

71% match

Maintenance of Bott Well Pump Station and Irrigation System

Closes 10/27/2026Opened 10/2/2026

County of Maui·Hawaii

71% match

Paunau Park Improvements

Closes 10/23/2026Opened 10/6/2026

Navajo Tribal Utility Authority·Arizona

71% match

NTUA PUMPHOUSE CONSTRUCTION FOR HOUCK WELL #4

Closes 10/19/2026Opened 10/2/2026

State of Hawaii Department of Transportation·Hawaii

71% match

ER-27(008) Kaumualii Hwy Drainage Imp Vic of Omao Stream Bridge

Closes 10/29/2026Opened 9/29/2026

Hawaii Department of Transportation·Hawaii

70% match

Remove crushed rock and hydroseed grass at Kahului Airport's bike path

Closes 10/27/2026Opened 9/15/2026

County of Maui·Hawaii

70% match

Kahului Fire Station Improvements for Additional Parking

Closes 11/5/2026Opened 10/2/2026

State of Hawaii Department of Transportation·Hawaii

70% match

STP-0377(008) Seismic Retrofit, Haleakala Hwy, 3 Bridges, Maui

Closes 10/29/2026Opened 9/15/2026

City of Huntington Beach·California

70% match

CC 1698 - Well 4 Facilities Upgrades

Closes 10/29/2026Opened 10/7/2026

County of Kauai·Hawaii

70% match

KFD Helicopter Hanger Construction

Closes 10/20/2026Opened 8/13/2026

State of Hawaii Department of Transportation – Harbors·Hawaii

70% match

S50236 Pavement Repairs at Various Locations at Hilo Harbor

Closes 11/5/2026Opened 10/1/2026

Hawaii Department of Transportation·Hawaii

70% match

Furnish and Delivery of Irrigation Supplies

Closes 10/18/2026Opened 10/6/2026

Washington County·Minnesota

69% match

RFP for CSAH 18 at CSAH 19 RAB Modifications

Closes 11/6/2026Opened 12/19/2025

County of Maui·Hawaii

69% match

Lahaina Fire Station Waterproofing Repair

Closes 11/6/2026Opened 10/7/2026

Navajo Tribal Utility Authority·Arizona

69% match

NTUA PUMPHOUSE CONSTRUCTION FOR HOUCK WELL #4

Closes 10/19/2026Opened 5/25/2026