The City of New York’s Department of Design and Construction is seeking a consultant to conduct a Capital Project Scope Development (CPSD) study for the Myrtle Avenue Corridor. The effort includes baseline condition analysis, corridor studies, constructability assessments, preliminary cost estimating, stakeholder workshops, and a final report to support funding requests. The solicitation is a Minority/Women‑Owned Business (M/WBE) RFP with a total cost ceiling of $400,000 and requires detailed staffing plans, resumes, and a Certificate of Authorization. Key deadlines include a release date of 9/15/2026, questions due by 9/23/2026, and proposal submission due 9/29/2026.
• Study scope covers existing conditions, corridor analysis, constructability, and cost‑benefit evaluation.
• Requires M/WBE qualification, all‑inclusive hourly rates, and compliance with NYC living‑wage and labor regulations.
• Deliverables: multiple technical reports and an electronic archive; total contract value capped at $400,000.