Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Oregon guideOregon Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Oregon
  4. ›Closed bids
  5. ›OSU-CASCADES INNOVATION DISTRICT REMEDIATION PHASE 1 DESIGN BUILD R…

Awarded contract·Oregon State University·Oregon

OSU-CASCADES INNOVATION DISTRICT REMEDIATION PHASE 1 DESIGN BUILD RE-SOLICIT

Won by Knife River Corporation – Northwest$24MAwarded 3/23/2023Single Award
Contract source

Awarded vendors

  • Knife River Corporation – Northwest

Description

The Oregon State University Cascades Innovation District Remediation Phase 1 project is a one‑step design‑build contract to remediate a former demolition landfill and pumice‑mine site in Bend, Oregon, and to construct supporting infrastructure (roads, utilities, storm‑water, etc.) for the new Innovation District. Knife River Corporation – Northwest was identified as the awardee. The contract is structured as a lump‑sum Guaranteed Maximum Price (GMP) with a separate preliminary design services fee and includes extensive environmental‑remediation tasks, heavy civil construction, and utility installation. The procurement was conducted via full and open competition, with a mandatory pre‑proposal meeting and a clear evaluation rubric covering experience, design‑build plan, execution plan, workforce diversity, and price. **Key Points** • Scope covers excavation, waste sorting, soil reclamation, road and utility design/construction, and possible mini‑roundabout design. • Environmental oversight provided by MFA; hazardous‑waste testing costs borne by OSU. • Total estimated project budget ≈ $24 million; contract execution expected 13 May 2023, substantial completion Dec 2024, final completion Mar 2025. • Awarded to Knife River Corporation – Northwest on 23 Mar 2023; one‑vendor award.

Attached files

Key dates

Bids closed
3/16/2023
Intent to award
3/23/2023
Awarded
3/23/2023
Contract modified
3/8/2023
Starts
5/13/2023
Ends
3/1/2025
Duration
22 months

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237990
Solicitation №
RFP 2023-010805

Contract value

$24,000,000

The RFP summary explicitly states an estimated total project budget of $24 million, covering design, remediation, construction, materials, bonds, and contingency. No other dollar figures are provided, and the Notice of Intent does not disclose a different amount. Given the scope (excavation, waste sorting, soil reclamation, road and utility installation, and potential round‑about construction) and the typical cost of similar brownfield remediation projects in Oregon, the $24 M figure is a reasonable estimate of the contract’s value.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Washington Northshore School District #417·Washington

Top match · 70%

District-Wide Seismic Retrofit Project

Closes 10/30/2026Opened 10/7/2026

City of Lake Oswego·Oregon

70% match

Ash Street and Lund Street – Storm System Improvements Project

Closes 10/29/2026Opened 9/29/2026

City of Waco·Texas

70% match

Flat Creek Reuse Project Phase 1A

Closes 12/1/2026Opened 10/2/2026

Cincinnati Department of Transportation and Engineering·Ohio

69% match

Columbia Pkwy & Riverside Dr Landslide Correction Dsgn/Build

Closes 10/23/2026Opened 10/6/2026

City of Cincinnati Department of Transportation and Engineering·Ohio

69% match

Columbia Pkwy & Riverside Dr Landslide Correction Dsgn/Build

Closes 10/23/2026Opened 9/18/2026

Missouri Department of Transportation·Missouri

69% match

STL District, University City, removal of the bridge on Kempland Place crossing River Des Peres

Closes 10/20/2026Opened 9/15/2026

Michigan Marysville Public Schools·Michigan

69% match

District Wide Remodeling Projects

Closes 10/28/2026Opened 10/6/2026

City of Cincinnati·Ohio

69% match

Columbia Pkwy & Riverside Dr Landslide Correction Dsgn/Build

Closes 10/23/2026Opened 9/18/2026

Oregon Bethel School District #52·Oregon

69% match

ITB - Site Improvement Project for K-12 School District

Closes 10/20/2026Opened 9/9/2026

Town of Eatonville·Florida

68% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of Dubuque·Iowa

68% match

North Fork Catfish Creek Multi-Site Design Services

Closes 11/6/2026Opened 10/9/2026

Cincinnati Department of Transportation and Engineering·Ohio

68% match

Columbia Pkwy & Riverside Dr Landslide Correction Dsgn/Build

Closes 10/23/2026Opened 10/1/2026

City of Cedar Rapids·Iowa

68% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Chaffey Joint Union High School District·California

68% match

RFP No. 26/27-009: Landscape Improvements - Districtwide

Closes 10/21/2026Opened 9/25/2026

The Ohio State University·Ohio

68% match

OSU-265465, MMP Rm 1080 and 1092 Renovations

Closes 10/29/2026Opened 10/7/2026

Department of General Services (DGS), DC·District of Columbia

68% match

Design-Build Services for Hendley ES Modernization

Closes 10/30/2026Opened 9/28/2026

Des Moines Public Schools·Iowa

68% match

ROOSEVELT HIGH SCHOOL – RE-ROOFING PHASE I PROJECT

Closes 11/5/2026Opened 10/8/2026

Penn State University - Office of Physical Plant·Pennsylvania

68% match

UP-FY 18-23 Capital Systems Renewal Program

Rolling / TBD closeOpened 4/11/2026

The Ohio State University·Ohio

68% match

OSU-260081 Fuel Tank and Dispensing Infrastructure Replacement REBID

Closes 10/15/2026Opened 10/1/2026

City of Cedar Rapids·Iowa

68% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

68% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Michigan Morenci Area Schools·Michigan

67% match

Morenci Area Schools: Elementary and MiS/HS Renovations

Closes 10/28/2026Opened 10/8/2026

City of Seattle·Washington

67% match

Outreach Event: Cascades Dam Tour

Closes 10/22/2026Opened 9/30/2026

Ferris State University·Michigan

67% match

Allied Health Building Renovation - Professional Design Services

Closes 10/22/2026Opened 10/1/2026

San Gabriel Unified School District·California

67% match

Project: PROJECT 25-89001

Rolling / TBD closeOpened 10/5/2026