Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wisconsin guideWisconsin Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Wisconsin
  4. ›Closed bids
  5. ›Frame Park Formal Gardens Pathway - BT.pdf

Awarded contract·City of Waukesha·Wisconsin

Frame Park Formal Gardens Pathway - BT.pdf

$174kSingle Award
Contract source

Description

This bid tabulation outlines the construction of a new pathway and associated irrigation and drainage improvements within Frame Park’s Formal Gardens. The scope includes traffic control, temporary fencing, demolition of existing sidewalks and drainage, grading, base course preparation, installation of PVC storm‑sewer pipe, field stone with geotextile, concrete sidewalks, topsoil and seeding, irrigation system installation, and brick edging. Two optional paving alternatives are offered: permeable precast concrete unit pavers and flexible porous pavement, each increasing the total bid amount. The primary bidder, All‑Ways Contractors, Inc., submitted a base bid of $174,493 with the alternate options costing $238,365 and $253,975 respectively. No award decision or contract terms are provided. • Comprehensive site preparation, utility removal, and re‑installation of drainage and irrigation. • Three paving options allowing the owner to select between conventional concrete, precast permeable pavers, or flexible porous pavement. • Detailed unit‑price breakdown for each line item, supporting a unit‑price or hybrid pricing structure.

Attached files

Key dates

Bids closed
4/11/2025

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110

Contract value

$174,493

The document provides explicit bid totals for three options: $174,493 (base), $238,365 (flexible porous pavement), and $253,975 (permeable precast pavers). Since no award is indicated, the contract’s prospective value would be the amount selected by the agency. Assuming the base scope is chosen, the contract value would be approximately $174.5 K. If an alternate is selected, the value rises to roughly $240–$254 K. Hence a reasonable estimate for the contract’s worth is in the $175‑$255 K range, with $175 K being the minimum likely commitment.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City and County of San Francisco·California

Top match · 66%

EXT REC | CON27-0006 Botanical Garden Paving- MLBE

Closes 12/31/2026Opened 8/24/2026

City of Cincinnati·Ohio

65% match

Bramble Park Trail

Closes 10/28/2026Opened 7/10/2026

Town of Coventry·Rhode Island

64% match

089-26 HARRIS PLAYGROUND PATH

Closes 10/20/2026Opened 10/6/2026

City of Cherry Valley·Arkansas

64% match

PARK IMPROVEMENTS TO INCLUDE CONSTRUCTION OF WALKING TRAIL AND RELATED IMPROVEMENTS

Closes 10/29/2026Opened 10/11/2026

Tampa-Hillsborough County Expressway Authority·Florida

63% match

P-0826 Parks Design Services

Closes 11/13/2026Opened 10/2/2026

Town of Babylon·New York

63% match

BID# 26G47 - FACADE IMPROVEMENTS TO 1823-1827A DEER PARK AVENUE, DEER PARK

Closes 10/15/2026Opened 9/26/2026

City of Trumann·Arkansas

63% match

Betty Street Park Improvements to Include Construction of Walking Trail and Related Improvements

Closes 10/16/2026Opened 9/27/2026

City of Haines City·Florida

63% match

Boomerang Park Nature Trail Project - Design Services

Closes 11/10/2026Opened 10/9/2026

City of Fort Myers·Florida

62% match

John Yarbrough Linear Park (JYLP) Trail Construction from Colonial Blvd. to Hanson St. Rebid (Sun Trail 447515-1-54-01)

Closes 11/9/2026Opened 10/7/2026

City of San Diego·California

62% match

Robb Field Gateway Path

Closes 10/29/2026Opened 9/28/2026

North Carolina Town of Holly Springs·North Carolina

62% match

RFQ 27-0928 Carolina Springs Park Master Plan

Closes 11/4/2026Opened 9/30/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

62% match

Tree Removal - James Baird State Park

Closes 10/26/2026Opened 10/2/2026

Assumption Parish Police Jury·Louisiana

62% match

Request for Qualifications: Engineering Services for Gilbert Dupaty Walking Trail Project

Closes 10/13/2026Opened 9/15/2026

City of Charlotte·North Carolina

62% match

SouthPark Loop - Cameron Valley Parkway

Rolling / TBD closeOpened 1/1/2027

Northern Virginia Parks·Virginia

62% match

Architectural and MEP Design - 400 SF Accessory Building at Meadowlark Botanical Gardens

Closes 10/30/2026Opened 10/7/2026

Pierce County·Washington

62% match

Orangegate Park Phase 1 Site Improvements

Closes 11/4/2026Opened 10/7/2026

City of Lake Wales·Florida

62% match

RFP 27-02 GC Services for Kiwanis Park Loop Trail

Closes 11/4/2026Opened 9/30/2026

U.S. Department Of The Interior·Colorado

61% match

Y--Pre-Proposal Site Visit

Closes 5/27/2027Opened 5/28/2026

City of Franklin·Tennessee

61% match

Mowing Services for City of Franklin, TN Parks Department

Closes 10/22/2026Opened 9/24/2026

City and County of San Francisco·California

61% match

EXT REC | CON26-0045 Sharp Park Trees - Micro LBE

Closes 12/31/2026Opened 2/25/2026

Alaska Recreational Trails Program·Alaska

61% match

RTP Grant Application - Girdwood Beaver Pond Trail

Rolling / TBD closeOpened 9/24/2026

City of Fountain Inn·South Carolina

61% match

PD Terry Park Pickleball and Tennis Courts

Closes 10/22/2026Opened 10/1/2026

City of Grand Rapids Department of Engineering·Michigan

61% match

Improvements to Lincoln Park – Project No. 24011

Closes 10/13/2026Opened 9/17/2026

Alaska Department of Transportation and Public Facilities·Alaska

61% match

RTP Grant Application - Eastland Trails Phase 2A

Rolling / TBD closeOpened 9/24/2026

City of Wildwood·Missouri

61% match

TAP-5500(692) Green Pines Park Connector Path

Closes 10/14/2026Opened 9/15/2026