This contract covers the design‑build‑install of an updated way‑finding and signage system for Terminal E at George Bush Intercontinental Airport (IAH). The scope includes demolition of existing interior signs, fabrication and installation of new interior way‑finding, room‑identification, and illuminated column‑wrap signs, as well as associated metalwork, concrete rehabilitation, low‑voltage electrical work, and finish painting. The awardee must meet a 24 % MWBE participation goal (15 % MBE, 9 % WBE), provide a 10 % security deposit, and furnish performance, payment, and maintenance bonds equal to 100 % of the bid price. The contract is a fixed‑price agreement with a 210‑day performance period.
• Manufacture, supply, and install interior way‑finding signage for Terminal E (IAH).
• Include demolition of listed existing signs and coordination with airport utilities and security.
• Must satisfy MWBE goals, provide required bonds, and comply with FAA/TSA security, drug‑free workplace, and OSHA standards.