Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Nevada guideNevada Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Nevada
  4. ›Closed bids
  5. ›RDA Downtown Corridor Sidewalk Project

Awarded contract·City of Elko·Nevada

RDA Downtown Corridor Sidewalk Project

Won by MKD Construction$2.2MAwarded 4/8/2025Single Award
Contract source

Awarded vendors

  • MKD Construction

Description

The City of Elko Redevelopment Agency contracted the reconstruction of downtown sidewalks along the central corridor, including demolition of existing pavement, installation of new concrete sidewalks, curb & gutter, post curbs, ADA‑compliant ramps, water‑service mains, storm‑drain HDPE piping, electrical outlets for tree lighting, and extensive landscaping/irrigation improvements. The work must comply with Nevada public‑works “Orange Book” specifications, prevailing‑wage rules, and extensive utility‑coordination requirements, and be completed within a 150‑day schedule. • Demolition of existing concrete/asphalt sidewalks and associated utilities • New construction of concrete sidewalks, curbs, water mains (10‑inch DI or PVC), HDPE storm‑drain, electrical receptacles, and irrigation system • Landscape planting of trees, shrubs, and related site‑stabilization (dust control, hydro‑seeding)

Attached files

Key dates

Bids closed
3/24/2025
Intent to award
4/8/2025
Awarded
4/8/2025
Contract modified
3/25/2025
Duration
150 days

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237990
Solicitation №
PWP-EL-2025-194

Contract value

$2,222,222

The bid tabulation shows three responsive bids totaling approximately $7.65 million, with the lowest bid (MKD Construction) at $2,222,222. Since the contract was awarded to MKD, the likely contract value is close to that low‑bid amount. Considering typical municipal contingencies and possible change orders, a reasonable estimate is between $2.2 million and $2.5 million.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Charlotte·North Carolina

Top match · 72%

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

California Department of Transportation·California

70% match

Construct sidewalk with fence, adjust and replace DIs.

Closes 10/22/2026Opened 9/21/2026

City of Santa Rosa·California

69% match

Downtown Connectivity to Support Housing Density

Closes 10/20/2026Opened 9/11/2026

City of Coronado·California

69% match

Downtown Enhancements – Phase 1

Closes 11/12/2026Opened 10/8/2026

Richland County·South Carolina

69% match

Friarsgate Boulevard Sidewalk Project

Closes 8/28/2027Opened 7/28/2026

City of Hickory·North Carolina

69% match

BL-0066 Springs Road Sidewalk

Closes 10/15/2026Opened 9/25/2026

Missouri Department of Transportation·Missouri

69% match

NW District, City of Maryville, South Main Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

City of Rancho Cordova·California

68% match

2026 ADA Sidewalk Improvement Project

Closes 10/21/2026Opened 9/30/2026

Missouri Department of Transportation·Missouri

68% match

Central District, City of Linn Creek, sidewalk improvements to West Valley Drive

Closes 11/5/2026Opened 9/30/2026

City of Ontario·California

68% match

Annual Sidewalk and Concrete Maintenance Project

Closes 10/15/2026Opened 9/24/2026

City of Riverside·California

68% match

Stover Avenue Sidewalk Improvements (Fury Drive to Eagle Rock Drive)

Closes 11/9/2026Opened 10/8/2026

Missouri Department of Transportation·Missouri

68% match

NW District, City of Maryville, South Mani Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

Nevada Government·Nevada

68% match

D2 Little Lane Rehabilitation Project

Closes 10/20/2026Opened 9/22/2026

City of Dania Beach·Florida

68% match

Sidewalk Rehabilitation Phase II

Closes 10/19/2026Opened 9/18/2026

People with Developmental Disabilities, NYS Office for·New York

68% match

CD23261 Greenwood Drive Extension - Sidewalk Replacement

Closes 10/14/2026Opened 9/18/2026

City of Pasadena·California

68% match

El Molino Avenue Demonstration Project

Closes 11/6/2026Opened 10/7/2026

County of DeKalb, GA·Georgia

68% match

Glenwood Sidewalk Improvement Project Phase III (24 Months)

Closes 11/6/2026Opened 10/5/2026

North Carolina Town of Knightdale·North Carolina

67% match

Old Knight Road Sidewalk Improvement Project

Closes 11/3/2026Opened 9/18/2026

Missouri Department of Transportation·Missouri

67% match

St. Louis District, St. Louis County, Sidewalk construction on New Halls Ferry Road between Lindbergh Boulevard (U.S. Route 67) and Cougar Drive

Closes 10/21/2026Opened 9/21/2026

Missouri Department of Transportation·Missouri

67% match

NE District, City of Shelbina, Construction Sidewalk along Hwy 15/Center Street from Spruce Street to Greenway Drive

Closes 10/15/2026Opened 9/17/2026

City of Portland·Maine

67% match

2026 Forest Avenue Sidewalk Project (PDF, 88.12 KB)

Closes 11/4/2026Opened 10/9/2026

City of Broken Arrow·Oklahoma

67% match

Oak Creek South Concrete Street Rehabilitation

Closes 10/27/2026Opened 9/29/2026

City of Chicago·Illinois

67% match

AUBURN GRESHAM CORRIDOR IMPROVEMENTS Section 1: 79th Street, Sangamon Street to Fielding Avenue and Halsted Street, 78th Street to 80th Street (SBI - I)

Closes 10/20/2026Opened 10/7/2026

Missouri Department of Transportation·Missouri

67% match

Central District, New Bloomfield, construction of ADA compliant sidewalk along Willow Drive and installation of RRFB at Route J school crossing

Closes 11/5/2026Opened 10/7/2026

City of Ottawa, Kansas·Kansas

67% match

Lakeside Estates Shared Use Path - Ottawa, KS

Closes 10/20/2026Opened 9/28/2026