The Turnberry Pump Station Replacement project is a comprehensive upgrade of the municipality’s water‑sewer infrastructure, encompassing demolition of the existing station, installation of new force‑main and gravity sewer piping, construction of a precast wet well, pump and meter installation, electrical work, and site fencing. The award was made to Teal Construction for a total bid amount of $1,148,888, with a locally adjusted price of $1,114,421.36. The scope includes 19 distinct line‑item tasks ranging from bonds and insurance to final fence installation, all presented as lump‑sum items. This contract represents a sub‑$1.2 M utility‑construction effort that may generate subcontracting opportunities in excavation, pipe installation, electrical, and site‑security work.
• Total contract value roughly $1.15 M (lump‑sum)
• Primary vendor: Teal Construction (Dover, DE)
• Scope covers full pump‑station demolition, new piping (6‑in. force‑main, 8‑in. gravity), wet‑well, meter vault, electrical, and fencing.
• No dates, performance schedule, or additional bidders were provided in the excerpt.