The Town of Holliston is seeking a contractor to install approximately 1,200 linear feet of PVC yard piping for its Wastewater Treatment Plant (Phase 1D). The work includes excavation, pipe installation, connection to three effluent tanks and treatment units, compliance with Massachusetts prevailing‑wage rules, OSHA safety training, and site restoration to loam and seed. The contract will be awarded to the lowest responsive and responsible bid.
• Scope: Dig, install ~1,200 ft of Schedule 40 PVC pipe, connect to existing plant structures, provide low‑pressure air testing for gravity piping, no hydrostatic testing for force‑main.
• Requirements: Prevailing‑wage compliance, 10‑hour OSHA construction safety training, insurance (CGL $1 M/$3 M, MV $500 k/$1 M, WC as required), three recent project references, various certifications (good‑faith, tax compliance, labor harmony).
• Schedule: IFB posted 10/21/2026, questions due 11/6/2026, sealed‑bid deadline/opening 11/12/2026 at 10 AM. Bids submitted to Town Manager’s Office, 703 Washington St., Holliston, MA.