Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Massachusetts
  4. ›Water and Wastewater
  5. ›WWTP Yard Piping Phase 1D

Massachusetts Town of Holliston·Massachusetts

WWTP Yard Piping Phase 1D

Closes 11/12/2026$150k – $300kInvitation for Bid
Get bids like this by emailBid source

Description

The Town of Holliston is seeking a contractor to install approximately 1,200 linear feet of PVC yard piping for its Wastewater Treatment Plant (Phase 1D). The work includes excavation, pipe installation, connection to three effluent tanks and treatment units, compliance with Massachusetts prevailing‑wage rules, OSHA safety training, and site restoration to loam and seed. The contract will be awarded to the lowest responsive and responsible bid. • Scope: Dig, install ~1,200 ft of Schedule 40 PVC pipe, connect to existing plant structures, provide low‑pressure air testing for gravity piping, no hydrostatic testing for force‑main. • Requirements: Prevailing‑wage compliance, 10‑hour OSHA construction safety training, insurance (CGL $1 M/$3 M, MV $500 k/$1 M, WC as required), three recent project references, various certifications (good‑faith, tax compliance, labor harmony). • Schedule: IFB posted 10/21/2026, questions due 11/6/2026, sealed‑bid deadline/opening 11/12/2026 at 10 AM. Bids submitted to Town Manager’s Office, 703 Washington St., Holliston, MA.

Attached files

Contact

James Keast(Procurement Contact)

[email protected]

(508) 429-0608

Key dates

Opened
10/21/2026
Questions due
11/6/2026
Closes
11/12/2026

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
BD-27-1627-BOS17-BOS17-134664

Budget estimate

$150,000 – $300,000

No contract price is disclosed. Based on typical municipal PVC piping installations (~$150‑$250 per linear foot including labor, excavation, testing, and restoration), a 1,200 ft project would likely range between $180,000 and $300,000. Additional costs for insurance, compliance reporting, and contingency could push the upper end higher, but $300k is a reasonable ceiling for budgeting.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Massachusetts Town of Holliston·Massachusetts

Top match · 96%

Holliston WWTP Phase 1D - Yard Piping

Closes 10/30/2026Opened 10/6/2026

The Metropolitan Water District of Southern California·California

83% match

Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump Station Intertie, Stage 1

Closes 11/17/2026Opened 8/4/2026

City of Austin·Texas

83% match

Lower Fort Branch Basin - Wastewater Pipeline Renewal

Rolling / TBD closeOpened 10/5/2026

Western Virginia Water Authority·Virginia

83% match

INVITATION TO BID: POAGES MILL WATERLINE EXTENSION - PHASE ii

Closes 10/28/2026Opened 9/28/2026

Town of Oakland·Florida

83% match

Briley Avenue Septic-To-Sewer

Closes 11/19/2026Opened 10/15/2026

Massachusetts City of Newburyport·Massachusetts

83% match

IFB No. 27-13: Hale Street Drainage Project

Closes 10/28/2026Opened 10/14/2026

Western Virginia Water Authority·Virginia

82% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

City of Farmers Branch·Texas

82% match

2026 Water and Wastewater - Capital Improvements Plan - Phase #1

Closes 10/29/2026Opened 10/7/2026

City of Columbus Ohio·Ohio

82% match

Parsons Avenue Water Plant – Wellfield Development – CW112 Raw Water Line

Closes 11/4/2026Opened 10/6/2026

City of Fairfield·Ohio

82% match

2026 Storm Sewer Rehabilitation via PVC Lining

Closes 10/26/2026Opened 10/9/2026

County of Frederick, MD·Maryland

82% match

Ballenger McKinney WWTP Phase 1 Solid Upgrades

Closes 11/2/2026Opened 10/1/2026

Delaware County Regional Sewer District·Ohio

82% match

Tartan Fields Manhole Replacement

Closes 11/13/2026Opened 10/13/2026

Town of Ipswich·Massachusetts

82% match

Ipswich Water Treatment Plant

Closes 10/26/2026Opened 8/12/2026

Georgia City of Sandy Springs·Georgia

82% match

27-014 Trenchless Stormwater Pipe Rehabilitation Project - 2027

Closes 11/19/2026Opened 10/19/2026

City of Daytona Beach·Florida

82% match

2701TB - Tomoka Farms Road & Bellevue Avenue Watermain Realignment Project

Closes 10/29/2026Opened 10/1/2026

City of Braintree·Massachusetts

82% match

Sewer System Rehabilitation - Year 13

Closes 11/5/2026Opened 10/14/2026

Commonwealth of Massachusetts, Executive Office of Energy & Environmental Affairs, Dept. of Conservation & Recreation·Massachusetts

82% match

Western – Water & Sewer Maintenance

Closes 10/29/2026Opened 9/25/2026

City of Douglas·Wyoming

81% match

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026

City of Philadelphia·Pennsylvania

81% match

PW Bid 2921 -CONSTRUCTION of GREEN STORMWATER INFRASTRUCTURE in UPLAND WAY

Closes 11/5/2026Opened 10/14/2026

City of Lynchburg·Virginia

81% match

CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026