Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Virginia guideVirginia Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Virginia
  4. ›Closed bids
  5. ›REPAIR OF COLLAPSED STORM SEWER SYSTEM - VENABLE STREET AND FOURTH…

Town of Farmville·Virginia

REPAIR OF COLLAPSED STORM SEWER SYSTEM - VENABLE STREET AND FOURTH STREET

Closes 9/10/2026$500k – $1MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Farmville is seeking bids from qualified contractors to repair and improve the functionality of the storm sewer system along Venable Street and 4th Street. The project includes mobilization, site preparation, traffic control, utility coordination, erosion and sediment control, excavation, removal and disposal of damaged materials, installation of new storm sewer pipe and appurtenances, repair or replacement of additional storm sewer components, bedding, backfill, and compaction, dewatering, and reconstruction of disturbed areas. The successful contractor will be required to provide all labor, materials, equipment, supervision, and incidentals necessary to complete the work. • The project requires compliance with various codes and regulations, including the Virginia Uniform Statewide Building Code and VOSHA safety regulations. • The contractor must provide a detailed project schedule and prosecute the work diligently to ensure completion within the specified timeframe. • The Town of Farmville reserves the right to direct the contractor to repair, replace, or rehabilitate additional storm sewer infrastructure within the project limits. • The contractor must comply with the provisions of the State Underground Utility Damage Prevention Act and conduct all land-disturbing and trenching activities in accordance with the Virginia Erosion and Stormwater Management Regulation. • The contractor must provide a designated individual holding a valid Virginia DEQ Erosion and Sediment Control (ESC) Inspector Certification to manage on-site compliance.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kim Thompson(Purchasing Agent)

[email protected]

(434) 392-3333

Key dates

Opened
8/14/2026
Questions due
9/1/2026
Pre-bid meeting
8/27/2026Mandatory
Closes
9/10/2026
Duration
180 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237110
Solicitation №
PW 26-0810-001

Budget estimate

$500,000 – $1,000,000

The budget for this project can be estimated based on the scope of work and the materials required. The project involves the repair and improvement of the storm sewer system, which includes mobilization, site preparation, traffic control, utility coordination, erosion and sediment control, excavation, removal and disposal of damaged materials, installation of new storm sewer pipe and appurtenances, repair or replacement of additional storm sewer components, bedding, backfill, and compaction, dewatering, and reconstruction of disturbed areas. The cost of these activities can vary depending on the location, materials, and labor required. However, based on industry standards, the total cost of the project can be estimated to be around $500,000 to $1,000,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Findlay·Ohio

Top match · 73%

Shinkle Street Storm Sewer Replacement

Closes 10/15/2026Opened 9/24/2026

Connecticut Town of Fairfield·Connecticut

73% match

2027-16 Storm Water Repair, Replacement, and Installation

Closes 10/14/2026Opened 9/24/2026

Gateway Services Community Development District·Florida

71% match

Sanitary Sewer Rehabilitation

Closes 10/21/2026Opened 9/18/2026

City of Charlotte·North Carolina

71% match

CTC Drainage Repairs

Rolling / TBD closeOpened 1/20/2026

New York City Department of Design and Construction·New York

70% match

Emergency Sewer Work

Rolling / TBD closeOpened 4/27/2026

New York City Department of Design and Construction·New York

70% match

Emergency Sewer Work

Rolling / TBD closeOpened 4/24/2025

City of Cincinnati·Ohio

70% match

Term Contract for Remedial Maintenance Work on Stormwater Dr

Closes 10/23/2026Opened 10/5/2026

City of Charlotte·North Carolina

70% match

Four Mile Creek Rd 9427 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/9/2026

Minnesota Department of Administration·Minnesota

70% match

Storm Sewer Lining/Sealing – Elgin, MN C-Store

Closes 10/23/2026Opened 9/30/2026

City of Charlotte·North Carolina

70% match

Euclid Avenue 1818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/15/2027

City of Norman·Oklahoma

70% match

Bid 2627-8 Findlay Ave Storm Sewer Replacement

Closes 10/29/2026Opened 10/2/2026

Massachusetts Town of Agawam·Massachusetts

70% match

Main Street Sewer Rehab Project

Closes 10/14/2026Opened 9/30/2026

City of Hudson, OH·Ohio

70% match

258 N. Main Street Storm Sewer Improvements

Closes 10/20/2026Opened 9/27/2026

City of Fairfield·Ohio

70% match

2026 Storm Sewer Rehabilitation via PVC Lining

Closes 10/26/2026Opened 10/9/2026

Maryland Baltimore County Government·Maryland

70% match

21169 SX0 Bird River and Bengies Sewershed Rehabilitation

Rolling / TBD closeOpened 5/22/2025

City of Coronado·California

69% match

First Street Stormwater Pump Station Flood Relief Project

Closes 11/9/2026Opened 9/23/2026

City of Fresno·California

69% match

Sewer Rehabilitation in Clinton, Fruit, McKinley, and West Avenues

Closes 10/27/2026Opened 9/29/2026

Maryland Baltimore City Department of Public Works·Maryland

69% match

Drainage Repairs and Improvements at Various Locations

Closes 11/4/2026Opened 10/7/2026

U.S. Department Of Defense·Missouri

69% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

City of Findlay·Ohio

69% match

Northtowne Sanitary Sewer Replacement – Project # 35664600

Closes 10/15/2026Opened 9/24/2026

City of Thousand Oaks·California

69% match

Moorpark Road Storm Drain Pipe (CMP) Lining and Repair at Pembridge Street (MI 2623)

Closes 10/21/2026Opened 9/18/2026

City of Charlotte·North Carolina

69% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026

City of Charlotte·North Carolina

69% match

Sanitary Sewer Point Repair and Replacements

Rolling / TBD closeOpened 7/1/2027

City of Charlotte·North Carolina

69% match

Camp Greene/Freedom Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2028

City of Ponca·Oklahoma

69% match

Ponca City Sanitary Sewer Bois D Arc' Phase III

Closes 1/30/2027Opened 1/14/2025