Description
The State of Illinois, Secretary of State, is entering into a change order with Clark Dietz for the design of the Parking Lots and Drive Lanes at the Dirksen Flagship Facility. The contract is being increased by $92,200.00. The project involves architectural consulting services.
• The change order is for the design of parking lots and drive lanes at the Dirksen Flagship Facility.
• The contract increase is $92,200.00.
• The project involves architectural consulting services with a NIGP code of 918-15.
• The bid type is open, and electronic quotes are allowed.
• The bid opening date is 11/17/2025 04:00:00 PM.