Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Contracts
  5. ›Oregon/Washington Terrestrial Assessment, Inventor
More bids in Oregon →

U.S. Department Of The Interior·Oregon

Oregon/Washington Terrestrial Assessment, Inventor

Closes 8/21/2026$500k – $2MRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Bureau of Land Management (BLM) is seeking a contractor to perform terrestrial assessment, inventory, and monitoring surveys in Oregon and Washington. The contractor will be responsible for collecting data at 198 terrestrial points during the 2027 field season, with the option to increase the number of points by up to 50. The contractor will also be required to provide a project implementation report and ensure that all data is collected and submitted in accordance with the Monitoring Manual for Grassland, Shrubland, and Savanna Ecosystems. • The contractor will be required to follow the Terrestrial AIM Data Management Protocol and the Monitoring Manual for Grassland, Shrubland, and Savanna Ecosystems. • The contractor will be responsible for ensuring that all data is collected within the specified timeframe and that all data is accurate and complete. • The contractor will be required to provide a hitch schedule and safety plan as part of their submission. • The contractor will be required to attend a post-award kick-off meeting and a pre-collection meeting with the BLM. • The contractor will be responsible for coordinating with BLM regarding private land access issues.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Matthew Duane(Contracting Officer's Representative (COR))

[email protected]

(503) 808-6317

Key dates

Opened
8/9/2026
Closes
8/21/2026
Duration
496 days

Last updated

Details

Type
Request for Quotation
Industry
Environmental Services
NAICS
541620
Solicitation №
140L4326Q0102

Budget estimate

$500,000 – $2,000,000

Based on the information provided, the budget for this opportunity is likely to be in the range of $500,000 to $2 million. This estimate is based on the fact that the contractor will be responsible for collecting data at 198 terrestrial points, with the option to increase the number of points by up to 50, and will be required to provide a project implementation report. The actual budget will depend on the contractor's proposed price and the BLM's evaluation of the proposal.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Tacoma·Washington

Top match · 65%

Technology Landscape Assessment

Closes 11/17/2026Opened 10/7/2026

City of West Sacramento·California

64% match

Phase 1 Environmental Site Assessments for the West Sacramento Levee Improvement Program

Closes 10/26/2026Opened 9/28/2026

Oregon Department of Forestry·Oregon

64% match

The Dalles Watershed Project GNA 2026

Closes 11/2/2026Opened 10/2/2026

Oregon Department of Forestry·Oregon

64% match

Willamette National Forest Aerial Seeding Under Good Neighbor Authority

Closes 10/16/2026Opened 9/25/2026

Washington Parks & Recreation Commission, State·Washington

63% match

Statewide Park System-Pudget Sound Area On-Call Eelgrass & Macro Algae

Closes 11/10/2026Opened 9/24/2026

Washington Fish and Wildlife, Department of·Washington

63% match

ROUTE CONDITIONS ASSESSMENTS

Closes 11/11/2026Opened 9/25/2026

Oregon Department of Transportation·Oregon

63% match

Transportation Land Use Planning Price Agreement

Closes 11/20/2026Opened 9/23/2026

Oregon Department of Transportation·Oregon

63% match

SPR881_Coastal_Drilling

Closes 10/13/2026Opened 9/28/2026

Washington Natural Resources, Department of·Washington

62% match

Airborne & Ground-Based Geophysical Data Collection

Closes 10/15/2026Opened 9/1/2026

U.S. Department Of The Interior·Virginia

62% match

C--Architect-Engineering firms for surveying project.

Closes 2/28/2027Opened 1/22/2026

Oregon Department of Transportation·Oregon

62% match

SPR892_879: Phase 3 CPT Wickiup

Closes 10/15/2026Opened 9/30/2026

Oregon Health and Science University·Oregon

62% match

Electrical Contractor

Rolling / TBD closeOpened 8/13/2019

Washington County, Oregon·Oregon

62% match

2026 Geotechnical and Materials Testing Services for Capital Project Services

Closes 10/14/2026Opened 9/28/2026

Oregon Department of Transportation·Oregon

62% match

SPR892_879: Phase 3 Drilling Wickiup

Closes 10/20/2026Opened 10/1/2026

Oregon Health and Science University·Oregon

62% match

Mechanical Contractors

Rolling / TBD closeOpened 11/6/2019

Oregon Health Authority·Oregon

62% match

Review of Waiver and Hazard Assessment Requests

Closes 2/8/2027Opened 2/7/2022

Idaho Department of Lands·Idaho

62% match

Mine Reclamation Plan Technical Review Services

Closes 11/9/2026Opened 10/7/2026

Oregon Health and Science University·Oregon

62% match

Landscaping Services

Rolling / TBD closeOpened 12/21/2020

U.S. Department Of The Interior·Oregon

62% match

AREMP AND WATER SAMPLE ANALYSIS

Closes 10/15/2026Opened 9/18/2026

SacSewer·California

61% match

On-Call Surveying Services

Closes 11/10/2026Opened 10/6/2026

Oregon Department of Human Services·Oregon

61% match

Request for Qualifications (RFQ) Environmental (Home) Modifications,

Closes 12/31/2028Opened 5/29/2026

City of Seattle·Washington

61% match

OC Environmental Monitoring and Consulting Services

Closes 10/21/2026Opened 9/29/2026

Oregon Health Authority·Oregon

61% match

Environmental Health and Safety (EHS) Solution

Closes 10/30/2026Opened 9/22/2026

Oregon City of Monroe·Oregon

61% match

Water System Modernization and Raw Water Intake Improvements

Closes 10/23/2026Opened 9/22/2026

Oregon Department of Corrections·Oregon

61% match

Infrastructure (VOIP) for the Oregon State Penitentiary

Closes 12/3/2026Opened 9/10/2026