The City of Waco is seeking a qualified consulting engineering firm to provide full‑service engineering, design, and construction‑oversight for the Flat Creek Reuse Project Phase 1A, which includes a concrete chlorine contact basin, a low‑head pump station, and a 2‑million‑gallon ground storage tank at the Waco Central Wastewater Treatment Plant. The firm must be licensed in Texas, demonstrate experience with wastewater reuse, pump stations, storage tanks, and federally funded water projects, and be able to complete design within 12 months and construction within a subsequent 18 months. Submissions are qualified statements of capability (SOQs) due Dec 1, 2026; the award is expected in Jan 2027.
• Scope: engineering design, permitting, and construction‑phase services for pump station, storage tank, and chlorine basin.
• Timeline: design 12 months, construction up to 18 months (total ≈30 months).
• Mandatory qualifications: Texas professional engineering license, no conflicts of interest, full compliance with RFQ instructions.
• Submission format: electronic via Bonfire portal or sealed paper package; no price information allowed.
• Evaluation: technical quality (experience, staff, approach) up to 100 points; award requires City Council approval if > $100 k.
• Contact: Melanie Wade, Purchasing Agent, (254) 750‑8098,
[email protected].