The City of Waco is seeking a qualified consulting engineering firm to provide full‑service engineering, design, and construction‑oversight for the Flat Creek Reuse Project Phase 1A. The scope includes design and construction of a concrete chlorine contact basin, a low‑head pump station, and a 2‑million‑gallon ground storage tank, plus associated engineering reports, permitting, and construction‑phase services. The selected firm must be licensed in Texas, demonstrate experience with municipal water‑reuse projects, and complete design work within 12 months of contract award, followed by up to 18 months of construction services. Submissions are SOQs due December 1, 2026; questions are due October 30, 2026. Award recommendation is expected January 2027.
• Engineering, design, and construction‑management for water‑pump station, storage tank, and chlorine contact basin.
• Must meet Federal, State (TCEQ), and City standards; partially federally funded.
• Design phase ≤ 12 months; construction phase ≤ 18 months (total ≈ 30 months).
• Required qualifications: Texas professional engineering license, relevant municipal water‑reuse experience, ability to work with FEMA, USACE, EPA, TWDB.
• Submission: SOQ (no price) via EUNA/Bonfire portal or paper by 2 PM CT, Dec 1, 2026.