The Lynwood Unified School District is seeking a qualified contractor to remove and replace 26 HVAC rooftop units across multiple buildings at Abbott Elementary School. The project is owner‑furnished, contractor‑installed (OFCI) and includes full mechanical, electrical, plumbing, structural, roofing, controls, testing, and commissioning work required to deliver a fully operational HVAC system that meets current California building and energy codes. The contractor must hold a California C‑20 (or C‑61 for HVAC) license, provide a 10 % bid bond, 100 % performance and payment bonds, and comply with prevailing‑wage, CWA, and DSA requirements. The bid opening is November 4 2026 with a no‑withdrawal period of 90 days, and the contract is expected to be awarded by mid‑November 2026 with construction commencing in early December 2026 and substantial completion targeted for early April 2027.
• Replace 26 owner‑furnished rooftop HVAC units (heat‑pump units) in Buildings A1, G, E, F, L, P.
• Perform demolition, roof‑curb installation, structural anchorage, electrical and plumbing connections, control system integration, and TAB (Testing, Adjusting, Balancing).
• Provide required bonds, insurance, CWA Letter of Assent, and meet all DSA, CALGREEN, and prevailing‑wage obligations.
• Mandatory pre‑bid conference/site walk on October 12 2026; pre‑qualification due October 19 2026; bid submission deadline November 4 2026.