The U.S. Navy’s Pearl Harbor Naval Shipyard is seeking a qualified contractor to provide all labor, equipment, tools, and materials needed to remove, test, and properly dispose of silt and sediment from the suction chambers of Dry Dock No. 2 and Dry Dock No. 3. The work is performed under a firm‑fixed‑price contract with a performance period of one year (21 Sep 2026 – 20 Sep 2027). Offerors must submit a technical capability statement (max 5 pages), detailed removal, environmental, safety, lift, and crane plans, and an itemized price breakdown. A site visit is scheduled for 11 Sep 2026; interested vendors must provide attendee names by 08 Sep 2026. All quotations are due by 15 Sep 2026 (09:00 a.m. HST) via email to the listed points of contact. The solicitation is set‑aside for small businesses, including HUBZone, SDVOSB, and WOSB.
• Scope: Clean and dispose of silt/sediment from two dry‑dock suction chambers.
• Contract type: Firm‑fixed‑price, $‑based quotation.
• Period of performance: 21 Sep 2026 – 20 Sep 2027 (1 year).
• Required submissions: Technical proposal (≤5 pages), removal plan, EPP, safety plan, lift & crane plan, past performance, completed SF 1449, and CLIN pricing.
• Mandatory registrations: SAM registration and CMMC Level 1 certification.
• Small‑business set‑aside (HUBZone, SDVOSB, WOSB).
• Site visit: 11 Sep 2026 (attendance optional but strongly encouraged).
• Questions due: 11 Sep 2026 5:00 PM HST.