Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Michigan guideMichigan Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Michigan
  4. ›Closed bids
  5. ›Design Engineering for the South Barton Pedestrian Bridge

City of Ann Arbor·Michigan

Design Engineering for the South Barton Pedestrian Bridge

Closes 7/30/2026$800k – $1.2MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Ann Arbor is seeking a qualified engineering firm to design a new 304‑ft pedestrian bridge over the Huron River at South Barton, including an observation platform and accessibility improvements to the adjacent parking lot. The scope covers all phases of design – from topographic and geotechnical surveys through structural analysis, construction‑ready drawings, permitting support, and coordination with community stakeholders. The contract is for professional‑services only; construction will be funded separately. • Design a two‑span continuous steel‑beam bridge with poured‑in‑place concrete deck (14‑ft clear width) and a mid‑span observation platform. • Provide full set of construction documents, cost estimates, and permit applications (EGLE, wetlands, floodplain, etc.). • Conduct surveys, scour analysis, geotechnical investigations, and coordination with utilities, public‑art commissions, and the Park Advisory Commission. • Deliverables include 15 %, 50 %, 75 % and 100 % design milestones, bi‑monthly progress meetings, and support for bid‑package preparation.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Hillary Hanzel(Landscape Architect / Capital Project Manager)

[email protected]

Key dates

Opened
6/26/2026
Questions due
7/8/2026
Pre-bid meeting
7/2/2026
Closes
7/30/2026
Duration
6 months

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541330
Solicitation №
RFP 26-37

Budget estimate

$800,000 – $1,200,000

The RFP notes that professional‑services fees are estimated at roughly 25 % of the total project cost, which is around $5 million for the bridge. This suggests an engineering fee of approximately $800,000‑$1,200,000, depending on scope depth, hourly rates, and any optional features (e.g., observation platform, boardwalk). Factors influencing the range include the firm’s staffing model, the extent of environmental permitting work, and the level of detail required for construction‑ready documents.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Giles County·Virginia

Top match · 68%

Engineering Services for Newport Community Sidewalk

Closes 10/13/2026Opened 9/14/2026

Louisiana Recreation and Park Commission for the Parish of East Baton Rouge·Louisiana

68% match

Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 10/27/2026Opened 9/30/2026

BREC·Louisiana

67% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 10/27/2026Opened 9/30/2026

Georgia Carroll County Board of Commissioners·Georgia

67% match

PW27-A001 Pre-Engineered Truss Bridge at Victory Church Road

Closes 10/13/2026Opened 9/10/2026

City of Spartanburg·South Carolina

67% match

Greenville Branch Phase 2 - Bridge and Park Components

Closes 10/15/2026Opened 9/11/2026

City of Columbia·Missouri

67% match

Replacement of Bridge 9 on MKT Trail

Closes 10/20/2026Opened 9/29/2026

Cherry Hill Township·New Jersey

67% match

2026 Downs Farm Bridge

Closes 10/16/2026Opened 10/6/2026

Connecticut Southington Engineering Department·Connecticut

67% match

Replacement of Bridge No. 04560, Newell Street over Quinnipiac River

Closes 10/14/2026Opened 9/16/2026

Georgia City of Winder·Georgia

67% match

RFQ# 2026-01 Jackson St. @ SR8 (May St.) - Pedestrian Bridge (PI#0021599)

Closes 11/19/2026Opened 10/12/2026

Massachusetts Department of Transportation·Massachusetts

66% match

608862 SOUTHBRIDGE FAP No. STP(BR-OFF)-003S(948)X Bridge Replacement, S-21-009, Mill Street over M

Closes 10/20/2026Opened 9/8/2026

New York City Department of Transportation·New York

66% match

84127P0001-TD/CSS for Crocheron Park Pedestrian Bridge Over BCIP, Borough of Queens

Closes 11/6/2026Opened 9/28/2026

Carrollton County·Georgia

66% match

Pre-Engineered Truss Bridge at Victory Church Road

Closes 10/13/2026Opened 9/10/2026

U.S. Department Of Defense·Tennessee

66% match

Ensley Engineer Yard East Connector Bridge

Closes 10/16/2026Opened 10/7/2026

Maryland Harford County Government·Maryland

66% match

US 40 Shared Use Path-Aberdeen Train Station to Havre De Grace

Closes 10/16/2026Opened 7/16/2026

Mount Ascutney Regional Commission·Vermont

66% match

Design Engineering: East Hill Rd Culvert Replacement

Closes 10/23/2026Opened 9/28/2026

New York City Department of Transportation·New York

66% match

84127P0001-TD/CSS for Crocheron Park Pedestrian Bridge Over BCIP, Borough of Queens

Closes 11/6/2026Opened 9/28/2026

Massachusetts Town of Ashland·Massachusetts

66% match

Construction and Installation of 2 Riverwalk Bridges

Closes 10/29/2026Opened 10/8/2026

City of Charlotte·North Carolina

66% match

Bridge Repair Design

Rolling / TBD closeOpened 6/30/2028

Maryland Transportation Authority·Maryland

65% match

Bay Bridge Protection Project

Closes 10/23/2026Opened 2/2/2026

City of Winter Park·Florida

65% match

456999-1-54-01 Stirling Avenue Bridge Replacement

Closes 10/14/2026Opened 7/9/2026

Town of Westwood·Massachusetts

65% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

City of Austin·Texas

65% match

Gilleland Wastewater Interceptor

Rolling / TBD closeOpened 8/17/2026

NYS Wayne County·New York

65% match

Hawley Road (CR 170) Over Red Creek Bridge replacement

Closes 10/22/2026Opened 9/18/2026

South Indian River Water Control District·Florida

65% match

SIRWCD Bridge Repair

Closes 10/22/2026Opened 9/23/2026

U.S. Department Of Defense·Oregon

65% match

Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement

Closes 10/29/2026Opened 10/1/2026