Description
The City of Salina is seeking contractors to replace its municipal water distribution mains under Project 26017. The addendum clarifies general notes, removes a pipeâthickness requirement for directional bore installations, and provides technical specifications for valveâbox removal, shoring, topâsoil placement, meterâpit installation, and material selections (ductileâiron, copper, limited HDPE). Bidders must acknowledge receipt of this addendum and comply with OSHA shoring requirements.
⢠Remove existing valve boxes at least 24 in. below finish grade; roadway boxes require a 3 ft à 3 ft excavation.
⢠Provide 6 in. of commercialâgrade topsoil in all excavations and disturbed areas.
⢠Directionally bored ductileâiron pipe follows pressure class 350 (â¤12 in.) or 250 (âĽ16 in.) â the Class 50 thickness clause is removed.
⢠Meterâsetter installation details, HDPE usage restrictions, and shoring obligations are detailed in the Q&A section.