The University of California, Los Angeles is seeking a pre‑qualified low‑voltage subcontractor to deliver a complete turn‑key broadcast integration system for the Acosta Operations Center, including associated interior construction modifications. The scope covers procurement, installation, testing, and commissioning of broadcast‑grade audiovisual equipment, fiber‑optic cabling, and related mechanical/electrical upgrades, as well as demolition, new partitions, fire‑protection systems, and hazardous‑material abatement within an occupied campus facility. The project budget is approximately $6.8 M and must meet LEED‑ID+C certification, UC Fair Wage requirements, and California low‑voltage licensing (C‑07 or C‑10). Bids are submitted electronically via BuildingConnected, with a pre‑bid conference and site walk provided for interested firms.
• Complete broadcast system (cameras, consoles, editing stations, TVs, processors) and dedicated fiber‑optic network.
• Interior demolition and construction of new partitions, ceilings, flooring, and fire‑sprinkler upgrades.
• Required low‑voltage licensing, HazMat abatement, LEED‑ID+C compliance, and UC Fair Wage adherence.
• Four pre‑qualified subcontractors may submit; bids due Oct 06 2026 (optional extension to Oct 13 2026).